Installation Guide
10 31-2000856 Rev. 0
Installation Preparation
REMOVE THE PACKAGING
Ŷ5HPRYHSDFNDJHV
from the "V" shaped
cardboard section.
Remove shipping pads.
Ŷ/LIWWKHKRRGRXWRIWKHER[
IMPORTANT: Lift the hood
by grasping the outside
HGJHVRIWKHH[KDXVW
opening on the top.
Ŷ7KHYHQWKRRGPRWRU
is shipped secured to
the skid with 4 screws.
Locate and remove 2
screws on each side of
the motor. Discard the
shipping skid and screws.
Ŷ*UHDVHILOWHUVPXVWEH
UHPRYHG*UDVSWKH
ODWFKSXOOWKHILOWHUXS
and lift out.
Ŷ/LIWWRUHPRYHWKH
grease trays. Set
grease filters and trays aside
IRUODWHULQVWDOODWLRQ'2127
',6&$5'
Ŷ)URPWKHLQVLGHRIWKHKRRG
loosen (do not remove) the
2 screws holding the wood
mounting support to the back of
the hood. The screws should be backed out of the wood
to 1/4". Remove the set aside the mounting support with
VFUHZVIRUODWHULQVWDOODWLRQ'2127',6&$5'
Ŷ5HPRYHWDSHDQGSDFNLQJPDWHULDOIURPWKHKRRGDQG
all supplied parts.
Hood
Parts
Wood
Mounting
Support
Motor
Mounted
on Skid
Shipping Carton
Duct
Transition
PARTS PROVIDED
Locate the parts packed with the hood.
HARDWARE PACKAGE
Locate and check contents.
Screws shown actual size.
6WDLQOHVV6WHHO*UHDVH)LOWHUV
(3 filters with 48" models)
$OOHQ:UHQFK
)RU,PSOHPHQW5RGV
Duct Transition
with Damper
Backguard
2 Implement Rods
and 4 Stand-offs
*UHDVH7UD\
Heat Lamp
(2 with 48" models)
:RRG6XSSRUW
with Original Screws
:DUPLQJ6KHOI
2 shoulder screws
to secure shelf to
bottom of hood.
3KLOOLSVKHDG
machine screws
to secure shelf to
bottom of hood.
3KLOOLSVKHDGVFUHZV
Use 6 to secure hood to
WKHZRRGVXSSRUWDUH
secured to wood support)
Use 2 to secure 30" and 36"
backguards to wall. Use 4 to
secure a 48" backguard.
3KLOOLSVKHDGVFUHZVWR
secure the transition to the
hood outlet on the top
6 (3/16") hollow wall
DQFKRUVZLWKVFUHZV
use 2 to secure
hood to the wall at
the bottom. Use 4 to
secure backguard
and shelf.
4 screws to secure the
wood support to the wall
32=,'5,9
KH[KHDGVFUHZDQG
ORFNZDVKHUWRVHFXUH
the blower
2 flat washers
for wall anchors