ZV800

49-80267 Rev. 4
Installation Instructions
WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE
DUCTWORK, WIRING LOCATIONS
'HWHUPLQHWKHH[DFWORFDWLRQRIWKHYHQWKRRG
Ŷ/RFDWHWKHWHPSODWHSDFNHGZLWKWKHOLWHUDWXUH
0HDVXUHIURPWKHIORRUWRWKHWRSRIWKH
FRRNLQJVXUIDFH$GGKRRGLQVWDOODWLRQKHLJKW
GHWHUPLQHGRQSDJH0DUNWKDWORFDWLRQ
-
Use a level to draw a straight pencil line on the wall.
-
Tape the template in position along the penciled line.
&+(&.72%(685(7+(7(03/$7(,6/(9(/
Ceiling ducting:
,IGXFWZRUNZLOOYHQWVWUDLJKWXSWRWKHFHLOLQJ
Ŷ8VHDOHYHOWRGUDZDOLQHVWUDLJKWXSIURPWKH
centerline on the template to the ceiling.
Ŷ0HDVXUH´IURPWKHEDFNZDOOWRWKHFHQWHUOLQH
of a 6-1/2” hole on the ceiling.
NOTE:,IGU\ZDOOLVQRWSUHVHQWDGGGU\ZDOOWKLFNQHVV
to the 3-3/4” dimension.
Wall Ducting:
,IGXFWZRUNZLOOYHQWWRWKHUHDU
Ŷ8VHDOHYHOWRGUDZDOLQHVWUDLJKWXSIURPWKH
centerline on the template.
Ŷ0HDVXUHDWOHDVW´DERYHWKHWRSPRXQWLQJ
bracket holes shown on the template to the
centerline of a 6-1/2” dia. duct hole. (Hole may be
elongated for duct elbow.)
HOUSE WIRING LOCATION:
Ŷ7KHMXQFWLRQER[LVORFDWHGRQWKHWRSOHIWVLGHRI
the hood.
Ŷ:LULQJVKRXOGHQWHUWKHEDFNZDOO´WR´DERYH
WKHERWWRPRIWKHKRRGDQGZLWKLQ´RIWKHULJKW
VLGHRIWKHFHQWHUOLQH:LULQJVKRXOGHQWHUDWOHDVW´
above the bracket on the right side.
1
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT: Framing must be capable of
supporting 100 lbs.
,IGU\ZDOOLVSUHVHQWPDUNWKHVFUHZKROHORFDWLRQVIRU
the top mounting brackets. Remove the template.
Ŷ&XWDZD\HQRXJKGU\ZDOOWRH[SRVHYHUWLFDOVWXGV
at the bracket location indicated on the template.
Ŷ,QVWDOODKRUL]RQWDOVXSSRUWDWOHDVW[EHWZHHQ
two wall studs at the mounting screw location. The
horizontal support must be flush with the room
side of the studs. Use cleats behind both sides of
the support to secure to wall studs.
Ŷ5HLQVWDOOGU\ZDOO
REAR WALL TEMPLATE
C
L
49-80271 JR 07-04
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
Drill 1/8"
Pilot Holes
ALIGN BOTTOM EDGE WITH
PENCIL LINE INDICATING
BOTTOM OF THE HOOD.
5-1/16"
9-5/8"
8-1/8"
2-1/16"
13-3/4"
12-3/4"
Ceiling
3-3/4” c enterline to wall
6-1/2” dia. hole
)RUFHLOLQJYHQWGXFWLQJ
Centerline
3-3/4” min.
above top
mounting
bracket holes
)25:$//9(17'8&7
Centerline of
Installation
Space
8" Min. Opening for Ductwork
View From Rear
Cleats
1" x 6" Min.
Mounting
Support
6” min. opening for ductwork
Centerline of
installation
space
View from rear
cleats
´[´PLQ
mounting
support