Installation Guide
16 49-80267 Rev. 4
Installation Instructions
WALL-MOUNTED INSTALLATION—RECIRCULATING
5
SIZE AND CUT DUCT PIECE
(cont.)
Ŷ&XWWKHGXFWSLHFHWRVL]HDQG
slip onto the bottom of the duct
connector.
Ŷ8VHGXFWWDSHWRVHDODQGVHFXUH
the duct piece to the connector.
Ŷ3ODFHWKHDVVHPEO\RYHUWKHKRRG
outlet.
Ŷ+ROGWKHDVVHPEO\DJDLQVW
the ceiling. The penciled
centerline should show
through the slot in the
deflector. Mark the screw
holes on the sides of the
assembly.
Ŷ5HPRYHWKHDVVHPEO\DQG
drill 1/8” pilot holes into the
wall studs.
Ŷ(QODUJHKROHVWKDWGLGQRW
enter studs to 3/8” and tap
SODVWLFRUPHWDODQFKRUVLQWRWKHKROHVIOXVKZLWK
the wall.
Ŷ0RXQWWKHDVVHPEO\RQWRWKHKRRGRXWOHWSXVKXS
against the ceiling and install the screws provided.
CAUTION
Do not use sheet metal screws at
the hood flange connection. Doing so will prevent
proper damper operations. Seal connection with tape
only.
ATTENTION
1¶XWLOLVH]SDVGHYLVDXWRWDUDXGHXVHV
pour connecter le rabat de la hotte. En utilisant des
YLVYRXVHPSrFKH]OHERQIRQFWLRQQHPHQWGXYROHWGH
fermeture. cellez la connection uniquement avec du ruban
DGKpVLI
5
SIZE AND CUT DUCT PIECE
Ŷ+ROGXSSHUDLUGHIOHFWRUZLWKGXFWFRQQHFWRUDJDLQVW
the ceiling.
Ŷ0HDVXUHIURPWKHERWWRPRIWKHDLUGHIOHFWRUWRWKH
top of the hood as shown.
Reduce that dimension by
1” to facilitate installation.
The duct will cover and
overlap the deflector and
the hood outlets.
4
MOUNT THE HOOD
Ŷ/LIWWKHKRRGRQWRWKHPRXQWLQJEUDFNHW
Ŷ&KHFNWREHVXUHLWLVOHYHO
Ŷ,QVWDOOZRRGVFUHZVWKURXJKWKHKRRGDQGLQWRWKH
wall on each side of the mounting bracket.
Ŷ([WHQGWKHFDQRS\IRUZDUGIRUEHWWHUDFFHVVWRWKH
rear mounting screw holes.
Ŷ,QVWDOOZRRGVFUHZVRUIDVWHQHUVWKURXJKWKH
bottom of the hood into the wall.
Install a wood screw
on each side of the
mounting frame
Mounting
bracket
Install bottom
mounting screws
Duct length
Measure
length