Installation Guide
49-80267 Rev. 4 21
UNDER-CABINET INSTALLATION
Installation Instructions
3
CUT THE OPENING
,IWKHFDELQHWKDVEHHQLQVWDOOHGUHPRYHLWIURPWKH
wall.
Ŷ8VHWKH7RS&DELQHW7HPSODWHWRORFDWHDQGFXWD
hole in the bottom of the cabinet.
Ŷ,IQHFHVVDU\SODFHWKHWHPSODWHRQWRSRIWKH
cabinet to accurately cut a matching hole.
Ŷ,QVWDOOWKHFDELQHWRQWRWKHZDOO
The cabinet must be firmly secured to the wall
and be capable of supporting 100 lbs.
INSTALL WOOD BLOCKS IF NECESSARY
Ŷ,QVWDOOILOOHUEORFNVZKHQHYHUWKHFDELQHWIUDPH
hangs below the cabinet bottom.
Ŷ,QVWDOOILOOHUEORFNVZKHQHYHUWKHFDELQHWERWWRPLV
less than 3/4” thick.
Ŷ,QVWDOOWKHILOOHUEORFNVRQHDFKVLGHRIWKHFXWRXW
The filler blocks will accept the hood mounting
screws.
NOTE: $GGLWLRQDOILOOHUEORFNVPD\EHUHTXLUHGDORQJ
the outside edges to accept the outside screws. See
Step 5.
IMPORTANT: ,IILOOHUEORFNVDUHQRWXVHGWKHKRRG
may not be secured to the cabinet.
4
INSTALL SIDE “L” BRACKETS
Ŷ,QVWDOOWKH³/´EUDFNHWVRQWRHDFKVLGHRIWKH
cutout. The wide flat portion should be on top of
the opening. Install 2 screws into the top of each
bracket.
5
REMOVE SIDE SCREW
The top center screw on both sides of the hood
can be used to close up any noticeable gaps at the
outside edges. See illustration.
Ŷ5HPRYHWKHFHQWHUVFUHZFRYHUDQGVFUHZRQHDFK
side as shown.
&DELQHW)UDPH
Cabinet Bottom Shelf
)LOOHU%ORFN
Top of Vent
Hood
Equivalent
to Depth of
Cabinet Recess
Install 2 screws in each
bracket
Remove screw
cover and screw