ZV850, ZV855

31-10725 Rev. 6 
Installation Instructions
INSTALLATION—RECIRCULATING
1
MOUNT TEMPLATE
Ŷ$OLJQWKHWHPSODWHZLWKWKHPDUNVRQWKHFHLOLQJDQG
tape in place.
±%HVXUHWKHWHPSODWHLVRULHQWHGFRUUHFWO\ZLWKWKH
front of the hood.
Ŷ8VHDSOXPEWREHVXUHWKHPRXQWLQJKROHVZLOO
provide parallel alignment with the countertop
below.
Ŷ&HQWHUSXQFKDOOKROHORFDWLRQV
Ŷ'ULOOSLORWKROHVLQWKHVFUHZ
ORFDWLRQV8VHD´ELWDQGGULOO
DSSUR[LPDWHO\´GHHS
Ŷ&XWZLUHDFFHVVKROH
DSSUR[LPDWHO\´GLD
2
INSTALL AIR DEFLECTOR AND
UPPER SUPPORT FRAME
The duct connector is shipped
inside the deflector.
Ŷ6QDSWKHSODVWLFFRQQHFWRURXWRI
the deflector and remove. Turn it
RYHU)URPWKHERWWRPVQDSWKH
connector over the opening.
Ŷ6OLGHWKHDVVHPEOHGGHIOHFWRU
into the upper support frame and
secure with 4 small screws.
Ŷ6HFXUHWKHXSSHUVXSSRUWIUDPHWRWKHFHLOLQJMRLVWV
and/or cross framing with the 4 screws provided.
)RUPD[LPXPULJLGLW\DQGVWUHQJWKWKHVFUHZVPXVW
be driven into the center of the joists and/or cross
framing.
Ŷ&KHFNWREHVXUHWKHVXSSRUWIUDPHLVOHYHO
vertically and horizontally.
Wire Access Hole
Front of Hood
127(%HVXUH
plastic connector
is installed on
the bottom of the
deflector as shown.