Installation Guide

16 49-80328 Rev. 4
2
INSTALL MOUNTING BRACKET
This vent hood must be secured to the horizontal
support or wall studs.
Ŷ:LWKWKHWHPSODWHWDSHGLQSODFHXVHDSXQFKWR
mark mounting bracket screw locations.
Ŷ'ULOO´SLORWKROHVLQRIWKHSXQFKHGORFDWLRQV
in the lower bracket.
Ŷ5HPRYHWKHWHPSODWH
Ŷ8VHZRRGVFUHZVWRVHFXUHWKHPRXQWLQJEUDFNHWWR
the wall. The screws must engage wall studs or the
installed horizontal mounting support.
Ŷ&KHFNWREHVXUHWKDWWKHEUDFNHWLVOHYHO
3
INSTALL DUCT BRACKET
The duct bracket should be installed against the back
wall and flush with the ceiling. This bracket will hold
the duct cover in place at the top.
Secure the bracket to the wall:
Ŷ$OLJQWKHPDUNHGFHQWHUOLQHRQWKHEUDFNHWZLWKWKH
centerline on the wall.
Ŷ0DUNVFUHZKROHORFDWLRQVLQWKHZDOO
Ŷ'ULOO´SLORWKROHVLQWKHPDUNHGORFDWLRQV
Ŷ,ISLORWKROHVGRQRWHQWHUVWXGVHQODUJHWKHKROHV
to 3/8” and install wall fastener anchors.
Ŷ'ULYHVFUHZVE\KDQGLQWRWKHIDVWHQHUVWRDOORZ
DQFKRUVWRH[SDQG5HPRYHWKHVFUHZV
Ŷ6HFXUHWKHEUDFNHWWRWKHZDOOZLWKZRRGVFUHZV
and/or fasteners.
14-5/8≤
to top of
bracket
C
L
t
ALIGN BOTT OM EDGE
WITH PENCIL LINE,
INDICA TING BOTT OM
OF THE HOOD
Drill 2 (two) 3/16≤ pilot holes through studs or rear wall support
REAR WALL
MOUNTING TEMPLA TE
49-80405 04-06 JR
Installation Instructions
INSTALLATION—RECIRCULATING