Assembly Instruction

IMPORTANT – READ CAREFULLY – RETAIN FOR FUTURE REFERENCE
MONTANA WOODWORKS, INC.
Assembly Instrucons for Bunk Bed
Thank you very much for purchasing an heirloom quality bunk bed from Montana Woodworks®. Should you
have any questions or need to contact sales or support, please do not hesitate to contact the customer ser-
vice representatives at our corporate offices at 1.888.889.3728 or via E-Mail at: cs@montanawoodworks.com
The companion video “bunk bed assembly” is available to view or download for free from our website:
www.montanawoodworks.com
Before beginning assembly please take a few moments to read the instructions carefully, understanding each
step before beginning. Likewise, please also ensure that the hardware package contains the items as de-
scribed here. NOTE: a ratcheting wrench or socket can be a considerable time saver during the assembly pro-
cess.
Tools Needed: ½” wrench or socket, hammer and standard (flat) screwdriver
Parts List: (24) 2 ½” x 5/16” Lag Bolts (24) 5/16” Flat Washers (24) Lag Shields
Component List: (1) Headboard (1) Footboard (2) Half Log Side Rails (2) Half Log Mattress Support Side Rails
(3) Wooden Mattress Support Slats (1) Mattress Support Webbing or Bunkie Board with attached wooden side
rails.
CAUTION: We recommend you have an assistant ready to help during the assembly process.
Step 1. With the headboard and footboard lying down, tap a lag shield into each of the 24 holes.
Step 2. Stand the headboard and footboard upright. Support them so that they do not fall over.
Step 3. Attach half log mattress support side rails (these have the full-length steel rails attached) to the lower
portion of the headboard and footboard using the supplied lag bolts and washers. Tighten fully with the ½”
socket or wrench.
Step 4. With the help of an assistant align top hole in metal bracket with the third hole down from the top of
the wooden post. Insert lag bolt and washer through metal bracket into hole, fastening one side of the Bunkie
board to the headboard and footboard. Do not fully tighten lags at this time as the assembly must swing
upward to allow securing of the other side.
Step 5. Swing the opposite side of the Bunky board upward so that the Bunky Board is horizontal. Repeat
step 4 above. Secure this side with the supplied lag bolts and washers. Do not fully tighten at this time.
Step 6. Attach the two top rails to the headboard and footboard with the supplied lags and washers. Tighten
these bolts and those installed in step 5 fully with ½” socket or wrench.
Step 7. Ensure that all bolts are fully tightened.
Step 8. Insert the three wooden mattress support slats between the bottom side rails.
ASSEMBLY IS NOW COMPLETE
WARNING: The manufacturer recommends a maximum 6” maress height for the top bunk. Maresses thicker than 6” may create
an unsafe condion resulng in injury.
*Pine requires a good sealant. We recommend two coats of varnish being applied per manufacturer’s direcons. The bunk bed
may be stained prior to nishing with varnish.
SEE REVERSE SIDE FOR IMPORTANT WARNINGS!

Summary of content (2 pages)