Installation Guide

3
© 2018 Monte Carlo Fan Company
10/2018
1 2 3
4 5 6
ON
OFF
ON
OFF
Before you begin installing the fan, Switch
power off at Service panel and lock
service disconnecting means to prevent
power from being switched on
accidentally. When the service
disconnecting means cannot be locked,
securely fasten a warning device, such
as a tag, to the service panel.
Use AC 120V/60HZ power supply
only.
Before installing this fan make sure the
outlet box is properly installed to the
house structure. To reduce the risk of
fire, electric shock, or personal injury,
mount to outlet box or supporting system
acceptable for fan support.
(Mounting must support at least 35 lbs.)
Use metal outlet box suitable for fan
support and use only the screws provided
with the outlet box (must support 35 lbs).
Before attaching fan to outlet box, ensure
the outlet box is securely fastened by at
least two points to a structural ceiling
member (a loose box will cause the fan to
wobble). Remove the two outlet box
screws provided with the box, aligning
the holes of the mounting bracket with
the holes of the outlet box. Reinstall the 2
outlet box screws securely.
Remove the set screws from Yoke. Keep
screws.
Remove the top housing. Insert blades (the 3 blades with a label
“This side up”) into the top slots on
flywheel.
Note: Make sure the side with a label
“This side up” is installed upward.
Mounting bracket
Set screw
Yoke
Top housing
Top slot
Bottom slot
Blade
This side up
This side up
This side up
This side up
Top housing