Installation Guide
3
© 2018 Monte Carlo Fan Company
10/2017
1 2 3
4 5 6
ON
OFF
ON
OFF
Before you begin installing the fan, Switch 
power off at Service panel and lock 
service disconnecting means to prevent 
power from being switched on 
accidentally. When the service 
disconnecting means cannot be locked, 
securely fasten a warning device, such 
as a tag, to the service panel.
Use AC 120V/60HZ power supply 
only.
Before installing this fan makes sure the 
outlet box is properly installed to the 
house structure. Ensure the outlet box is 
securely fastened by at least two points 
to a structural ceiling member (a loose 
box will cause the fan to wobble). 
To reduce the risk of fire, electric shock, 
or personal injury, mount to outlet box or 
supporting system acceptable for fan 
support. 
(Mounting must support at least 35 lbs.)
Use metal outlet box suitable for fan 
support and use only the screws provided 
with the outlet box (must support 35 
lbs). Remove the two outlet box screws 
provided with the box, aligning the holes 
of the mounting bracket with the holes of 
the outlet box. Reinstall the 2 outlet box 
screws securely.
For Canadian installation and for USA fan 
and light kit combinations over 35 lbs, in 
both flush and downrod modes the safety 
cable must be installed into the house 
structure beams using 3” lag screws, 
washers and lock washers provided. 
Note
: If Installing The Secondary Support 
Safety Cable in the U.S., Do Not Remove 
Knockouts In The Outlet Box.
Place motor assembly on bottom 
Styrofoam for blades installation.
Aligning the holes on blade and the screw 
holes on bracket preassembled on motor 
as shown in illustration, and then partially 
install the set screws with blade rubber 
plug. Screws provided. Repeat this 
process for remaining blades.
Tighten all set screws securely after all 
the blades are installed to motor.
Caution: Make sure the blade rubber 
plug is in position. 
Flip the motor assembly with blades over.
Partially loosen downrod set screws from 
yoke at top of motor assembly.
Remove preassembled cross pin and 
keeper pin from downrod. 
Ceiling
2˝ x  4˝
Ceiling
Joists
Outlet
Box
Safety cable
Junction
Box
Mounting
Bracket
Lag screw
Safety cable
Washer
Lock washer
Screw/ Washers
/Spring Washers
Ceiling joist
Outlet Box
Mounting
Bracket
SAFETY CABLE INSTALLATION
Blade
Bottom Styrofoam
Cross
pin
Keeper
pin
Downrod
Yoke
Blade rubber plug










