Use and Care Manual

INSTALLING P.C.S.S. ROOF COVERING (CONT'D)
1
3
2
At the end rafter and on the intermediate extrusions between
each roof panel, you will need to attach a piece of aluminum
cap. Lay the cap in place and Screw into place using#12x2"
washer teks on all end rafters and #12x1" washer teks on
intermediate rafters approx. 36" apart
P.C.S.S. P.C.S.S.
P.C.S.S.
P
C
S
S
INTERMEDIATE
RAFTER
END RAFTER
Fig. J
Fig. K
If theAluminum cap extends beyond the edge of the house,
remove the excess by cutting it flush with the outside edge of
the eave extrusion using a hack-saw. (See photo 3)
VERY IMPORTANT:
Once all the P.C.S.S. roof panels have been
installed, you must insert a tek-screw through each of
the P.C.S.S. support brackets into the purlins. Failure
to do so, could result in structure failure in severe
weather conditions.
Finish off the end walls by capping each gable end peak,
using a peak cap. Allow the 1-1/2" flange of the peak cap
to slide between the end rafter extrusion and the snap cap
until the peak cap is lying flush against the end wall.
Center the peck cap and insert two #12 x 2" washer tek-
screws through the aluminum cap, the peak cap and into
the end rafter extrusion. (See the above photo & Fig. J)
PEAK
CAP
SNAP
CAP
SNAP
CAP
2- TEK-SCREWS
PEAK CAP
WASHER TEK SCREW