Owner`s manual

Page 12
H-Series DL Gas Fireplace
Part No. XG0140 - 092210
18
48”
A
C
B
Figure 15a. Top Vented, wall mounted installation with1 elbow (1 one
90° bend). The vent run must comply with Venting Graph for
Top vent, wall mounted terminations, Figure 13, 14 & 15.
Figure 15b. Top Vented, wall mounted Multi-elbow installation. See
Venting Graph for Top vent, wall mounted terminations,
Figure 13, 14 & 15.
Solid Section
Flex Section
Hearth
30”min
15’foot Max.
RHS8 Heat
Shield
Termination
Exterior
Wall
8’foot
Max.
The Venting Graph: H42DL*
Measure the vertical height from the replace hearth to the centre of the
termination and the horizontal run from the replace ue collar to the wall
ange of the termination. Plot on the Venting Graph Figure 15 with an 'X'.
If the 'X' falls on or above the top boundary of the shaded area, the
installation is acceptable.
Example A: (Acceptable Installation)
If the vertical dimension from the hearth is 84" and the horizontal run to
the wall ange of the vent termination is 36", this would be an acceptable
installation.
Example B: (Acceptable Installation)
If the vertical dimension from the hearth is 120" and the horizontal run to
the wall ange of the vent termination is 132", this would be an acceptable
installation.
Example C: (Unacceptable Installation)
If the vertical dimension from the oor of the replace is 72" and the
horizontal run to the wall ange of the vent termination is 108", this would
NOT be an acceptable installation.
Installation
If your installation does not fall
within the venting graph para-
meters, please contact Montigo
for Power Venting options.
Unacceptable vent run
within shaded area.
Acceptable vent run
within non-shaded area.
Figure 15 H42DL* Top Vent Venting Graph for wall mounted
terminations, See Figures 15a & 15b.
RHS8 Heat
Shield
Termination
Hearth
Exterior
Wall
Flex section
shown
41"Min. H34DL*
44"Min. H38DL*
48"Min. H42DL*
72"Max. H34DL*
34"Max. H38DL*
18"Max. H42DL*