Owner`s manual
Page 23
H-Series DL Gas Fireplace
Part No. XG0140 - 092210
Installing the Logs:
The H38DL* and H42DL* is supplied with a seven ceramic bre log
logset. Unpack the logs and handle them very carefully.
Step 1. Remove the glass door as described on Page 21.
Figure 30a. Placing Bottom Rear Log.
Step 2. Place the bottom Rear log as shown in gure 30a.
Pilot Assembly
Fireplace Base
Rear / Bottom Log
Notch in Log
Installation
Figure 30c. Placing Bottom Right Log.
Align
Bottom Left Log
Air Inlets
Align
Bottom Right Log
Figure 30b. Placing Bottom Left Log.
Step 3. Place the bottom Left log as shown in gure 30b.
Top
Right Log
Top Right
Log
Align Pins
Align Pins
Top
Left Log
Top Left
Log
Notch in Log
Step 4. Place the bottom Right log as shown in gure 30c
Step 5. Place the Top Right and Left logs using the (4) four alignment
pins protruding from the top of the Right and Left Bottom Logs,
as shown in gure 30d. With these pins align the Top Right and
Left logs using the predetermined alignment holes cast into the
underside of the logs, as shown above, gure 30d insets.
Step 6. Place the Centre Front log , Figure 30e below, as shown using
the notch cast in the Bottom Rear log as shown in gure 30d
above.
Figure 30d. Placing Top Right and Left Logs.
Step 7. Place the Front Centre log as shown in gure 30e.
Center Front Log
Centerline of Fireplace
Figure 30e. Placing Centre Front Log.
Right Front
Log
Groove
in Log
Rest Log
Figure 30f. Placing Right Front Log.