Section 2: Framing
Installation
1). Frame in the enclosure for the unit with framing materials. The
framed opening for the assembled replaces are as shown below,
see Figure 2
.
NOTE: When constructing the framed opening, please ensure
there is access to install the gas line when the unit is installed.
See Figure 22.
Clearances
When installing a shelf over the top of the replaces, the following
guidelines must be adhered to:
For Rear Vent applications, the minimum clearance is 2" from the rear
of the replace to a wall, or any combustible materials, and 9" clearance
from the top of the replace to the underside of any combutible shelf
materials.
For Top Vent applications, the minimum clearance is 2" from the rear of
the replace to a wall, or any combustible materials, and 17 1/2" to the
underside of any combustible shelf materials, Figure 4.
For Top or Rear Vent applications where the Minimum mantel height
is required above the replace, (for an alcove or low prole shelf), ALL
Materials MUST BE NON-COMBUSTIBLE, Figure 5. The minimum
clearance is 2" from the rear of the replace to a wall, or any combustible
materials.
The replace clearances are shown below:
* When sheetrock is not used behind
the replace, framing depth "O" may be
reduced by 5/8".
0" clearance
to corners only
P”
N”
Q”
N”
M”
O”
Figure 2. Framing dimensions, (Straight wall & Corner Installation).
(ALL Models, shown in Table on Page 3).
Figure 4. Combustible Framing for shelves over the replace, Top
vent.
Figure 3. Combustible Framing for shelves over the replace, Rear
vent.
H*DL* 9 17 1/2 2 1 0 4
MODEL
Top -
Rear Vent*
Top -
Top Vent
Back
Sides
Floor
Mantel
M N O P Q S T
H34DL*
37 1/4 33 3/4 17 7/8 52 3/8 37 31 41
H38DL*
40 1/4 37 3/4 18 7/8 57 1/2 40 5/8 34 44
H42DL*
44 1/4 42 19 3/8 63 3/4 45 1/8 38 48
Installing The Standoffs
To avoid elevated mantel temperatures, all H*DL*- Series gas
replaces are required to have the supplied standoffs installed.
The replace is supplied with two standoffs. Bend and install these
standoffs on top of the replace ensuring that the height of the standoff
maintains a MIN. 6" clearance.
Figure 6. Installing the standoff's.
M
9”
S
L
18”
max.
2”
min.
Combustible
Header
Combustible
Shelf
Exterior
Wall
L
PEL Shor t
90° elbow
M
17 1/2”
2” min.
Combustible
Header
Combustible
Shelf
Exterior
Wall
"L" Dimension, see
table on Page 5.
*
Dimension for Top
vent replaces, see
graphs, gures 14,
15 & 16.
*
6"