Owner`s manual


Page5
XG0649 - 031511

Section1:InstallationOverviewandProductDimensions
PleasereviewthePre-InstallationChecklistonPage4
for
general
information
on
preparing
for
a
successful
installationofyourreplace.
The H-Series H36PVN & replace
The
H
36PVN
replaces may be installed in any location that
maintains proper clearances to air conditioning ducts, electrical
wiring and plumbing
Safety, as well as efciency of operation,
must be considered when selecting the replace location
Try
to select a location that does not interfere with room trafc,
has adequate ventilation, and offers an accessible pathway for
Power Vent installation
The replace dimensions are shown below:
Clearances
To ensure the H-Series H36PVN Fireplaces operate safely, all
models must maintain the following clearances
*Note: Finishing hardwood, laminate ooring, or tile may be placed
directly in front of replace, however Montigo waives responsibility for
discoloration of ooring materials Ability to withstand heat should be
discussed with the ooring manufacturer If carpet is to laid there must
be a 12" clearance or hearth between the front of the replace and the
start of the carpet
The H36PVN & H36PVL are power vented
fireplace systems. Under no circumstances can
these model(s) be installed without a power vent
module.
For regular Horizontal vent installation use 5"/8"
model EDVWSPV58 with the rough-in kit,
EDVWSPV58F for the
For regular Vertical vent installation use 5"/8"
model EDVRSPV58 with the rough-in kit, EPVF58
for the H36PVN & H36PVL.
WARNING
XW2022

Model# Top Sides Back
Floor
(under)
Floor
(front)*
H36PVN 8" 0" 1" 0" 0"
Figure1.Fireplace dimensions.
23
32”
8 3/4”
C
L
8”
5”
41 ¼”
46”
2”
2”
¾”
9”
31 ½”
38 ½”
Nailing
Flange
Nailing
Flange
1”
5 ¾”
23”
Power Vent
Communication
Harness Port
Main Incoming A/C
Power Connection
Wht
Access Panel
Wall Switch
LVT Connection
10”
4”
Flexible Incoming
Gas Connection
Access
Panel
Blk
Top View
Front ViewLeft
Side View
Right
Side View
23
32”
8 3/4”
C
L
8”
5”
41 ¼”
46”
2”
2”
¾”
9”
31 ½”
38 ½”
Nailing
Flange
Nailing
Flange
1”
5 ¾”
23”
Power Vent
Communication
Harness Port
Main Incoming A/C
Power Connection
Wht
Access Panel
Wall Switch
LVT Connection
10”
4”
Flexible Incoming
Gas Connection
Access
Panel
Blk
Top View
Front ViewLeft
Side View
Right
Side View