Section2:Framing
Step1. To frame in the unit rst frame a rough-in enclosure with
combustible framing materials, using typical framing practices The
rough-in frame opening for the assembled replace is 46" wide, x
50" high x 24" deep See Figure 2
N
OTE:
W
hen
c
onstructing
t
he
f
ramed
o
pening,
p
lease
e
nsure
thatyourcombustible2x4headerisat50"minimumand
that
there
is
access
to
install
the
gas
line
when
the
unit
is
installed.SeeFigures1and2a.
Step
2
Place the Fireplace in the enclosure and install the Vent pipe,
and Power Vent module
Next, Connect the Gas line and provide a
gas service shut-off valve; according to local gas codes, then secure
in place with 1/4" wood screws Install supplied Non-combustible
header at 45½" from oor
46”
24”
50”
(minimum)
Flexible
incoming gas
connection
Secure nailing
flange to 2 x 4’s
using ¼" wood
screws.
Non-combustible Header (supplied by montigo), install to allow
15½” of Non-combustible cement board to fasten above the
glass of the unit and Non-combustible header.
Figure 2a. Fireplace installation, (Inlet Gas & Power Vent) .
Figure 2. Fireplace installation (combustible frame dimensions)