Owner`s manual
Page 13
H42DF Series Indoor Gas Fireplace
Part No. XG0148 - 012810
18”
33”
B
C
A
Vertical Run (in.)
Example A: (Acceptable Installation)
Iftheverticaldimensionfromthehearthis84"andthehorizontal
runtothewallangeoftheventterminationis36",thiswouldbe
an acceptable installation.
Example B: (Acceptable Installation)
Iftheverticaldimensionfromthehearthis72"andthehorizontal
runtothewallangeoftheventterminationis66",thiswouldbe
an acceptable installation.
Example C: (Unacceptable Installation)
Iftheverticaldimensionfromtheoorofthereplaceis72"and
thehorizontalruntothewallangeoftheventterminationis84",
this would NOT be an acceptable installation.
Figure 22c. H42DF Multi-Elbow Venting Graph.
Installation
Figure 23. Multi-elbow installation.
For H42DF distance 'H' must be a minimum of 50".
The vent run must comply with gure 22b.
NOTES: All dimension lengths for vertical or horizontal runs are
measured from center of the vent pipe.
Venting runs must fall within the limits set by the venting
graph (see Figure 22a).
Power Vent models, EDVPV47
LDVPV47, EDVRSPV47, and
EDVWSPV47 to be used within the
shadedareaofgraph.(SeeBELOWfor
applicable Product information).
B. Multi-Elbow Installations
Formoredifcultinstallationsituations,theH42DF-Series Rear Vent
maybeinstalledwithtwo-90°elbowsandupto15'ofhorizontalrun.If
using this installation option, you must adhere to the following guidelines:
therst90°elbowmustbeplaceddirectlyontheuecollar
youmusthaveaminimumverticalliftof45"(measuredfromthe
hearth)
your vent run must fall within the limits set by Figure 22a
Before you install any venting, you must determine whether the venting
runwillbeacceptable.Unacceptableventingcanaffectthereplace's
combustion.
The Venting Graph
Measuretheverticalheightfromthereplacehearthtothecentreofthe
terminationandthehorizontalrunfromthereplaceuecollartothewall
angeofthetermination.PlotontheVentingGraph(Fig.22a)withan'X'.
Ifthe'X'fallsonorabovethetopboundaryoftheshadedarea,the
installation is acceptable.
18"
50”
33”
A - TerminationP TO-3(3"Length)
PTO-3F(3"Length)
B - Stucco Kits MSR (Stucco Frame)
BSR-4(4"BrickFrame)
BSR-6(6"BrickFrame)
MOSR(StuccoCan)
C - Flex Sections PFL-1(12"Section)
PFL-2(24"Section)
PFL-3(36"Section)
PFL-4(48"Section)
D - Rigid
Sections
PEXT-1(12"m/fSection)
PXT-20(20"section)
PEXT-2(24"m/fSection)
PEXT-3(36"m/fSection)
PEXT-4(48"m/fSection)
E - Elbows PEL-90MM (m/m 90° Elbow)
PEL-90FF (f/f 90° Elbow)
PEL-90FM (f/m 90° Elbow)
PEL-45FM (f/m 45° Elbow)