Section 4-2-2: Venting Components
The following venting components and associated Montigo part
numbers are available for horizontal installations:
Connection and installation of the vent components should
adheretothefollowingguidelines:
Connect all vent sections using a minimum of three sheet
metal screws on the outer pipe ue.
Ensure the pipe ends male to female slide in a minimum
of 1 1/2“ of overlap.
Ensure all runs are supported with a minimum of 3 supports
per 10’ of venting.
When hanging/ supporting venting, ensure that 1” clearance
is maintained on all sides to any combustible material.
Ensure when cutting sections of rigid pipe to maintain
integrity of internal supports.
Place the springs, supplied with the pipe kit, between the
outer and inner pipes to keep the pipes separate and avoid
any possible hot spots.
Montigo recommends the use of a ex section for the nal
pipe connected directly to the replace offering greater
exibility of installation and absorption of movement.
All exterior joints in venting should be sealed with high heat
silicone RV230.
Section 4-2-3: Installation of the horizontal external
wall mounted power vent module.
Note: See power vent manual for installation instructions.
Refer to AppendixA-PowerVentlocations, to ensure the planned
Vertical Power vent location is acceptable.
A - Termination PVHEX510-300 Wall Mount
5'/10"
PVHFL510-300 Flush Wall
Mount 5'/10"
C - Flex Sections RFL1 (12" f/f Section)
RFL2 (24" f/f Section)
RFL3 (36" f/f Section)
RFL4 (48" f/f Section)
RFL6 (72" f/f Section)
D - Rigid Sections RXT - 10 (10" f/f Section)
RXT - 20 (20" f/f Section)
REXT - 1 (12" f/m Section)
REXT - 2 (24" f/m Section)
REXT - 3 (36" f/m Section)
REXT - 4 (48" f/m Section)
REXT - 6 (72" f/m Section)
E - Elbows REL-90MM (m/m 90º Elbow)
REL-90FF ( f/f 90º Elbow)
REL-90FM ( f/m 90º Elbow)
REL-45FM ( f/m 45º Elbow)
F - Support Ring & Plate RSPXT-10
G - Firestop FS-10
H - Heat Shield RHS102
Section 4-3: Heat Shields
Installing a Wall Mounted RHS102 Heat shield
The RHS102 Heat shield mustbeusedifventpipepassesthrough
awallorceilingwithin6'oftheunit.
To install the RHS102, Slide the Inner Section over the vent pipe
that will connect to the replace. Then fasten the vent pipe to the
back of the replace with a minimum of three sheet metal screws.
From the outside slide the RHS102 outer section on. To complete
the installation fasten the Heat Shield Outer Section & inner section
to the structure. See Figure 7 Sec.4.
Figure 7 Sec.4
RHS102 Installation. (Install by sliding over vent pipe
where it passes through the combustible construction).
Outer Shield 11 1/2”
½ ” Min. Both sides Typical
½” Min
.
½” Min
.
Combustible Framing
Inner Shield 11 1/3”
R520-ST & R620-ST Power Vent Indoor Gas Fireplace
Page 15
XG0773 - 150127
Installation