Owner`s manual
Page 11
C-View Residential R520-R620 Series Indoor Gas Fireplace
Part No. XG0771 - 070111
f i r e f e a t u r e
Installation
Step 2.
Insert the Power Vent Rough-in Box as shown in Figure 5a. Fas-
ten the Box securely in place with Screws or nails, Figure 5a.
Apply exterior sheathing and nishing, if required. (Figure 4a).
Step 3.
Next, remove the bottom collar and conduit mounting frame as
shown Figure 6. (Place removed hardware in a handy location
for re-assembly).
Figure 5a. Orientation, Placing the Power Vent Inner Box
Framing
Rough-in Frame
Figure 5b. Installation of Rough-in Kit
Figure 5c. Installation of Power Vent Conduit
Step 4.
Insert the conduit from the Power Vent Module into the rough-in
frame through the two top right entry holes. Remove the nut from
the supplied strain relief and place as shown, Figure 5c.
Figure 5d. (Installing Conduit connector & conduit mounting frame)
Step 5.
Securely fasten the bottom Collar pan into the Rough-in frame
using the existing hardware, (4-pcs). Tighten the Strain Relief nut
onto Strain relief tting.
Step 6.
Pull the Power Vent Connector, (from behind) half-way through
supplied hole in conduit mounting frame, and snap into place,
(notches in two plastic wing clips. Orientation not critical).
Figure 5e. (Assembled Rough-in Kit)
Step 7.
Fasten the Conduit mounting frame into place using the existing
hardware, (6-pcs). (Coil conduit in behind cover.)
Step 8.
Install the Power Vent Power / communication harness. Hold the
Power Vent in close proximity of the assembled Rough-in Kit,
and plug in the Power Vent communication / Power Cord. (Note
the direction and orientation of the pins inside the Power Vent
connector, the snap them together). (Figure 5f).
Strain Relief
Power Vent Conduit
Strain Relief
Nut
Tightened hardware,
6-pcs.
Installed Power
Vent Connector
Power Vent Conduit
Strain Relief & tightened nut
Power Vent
Connector
Conduit
mounting
frame
Tightened hardware,
4-pcs.