Owner`s manual
Page 17
C-View Residential R520-R620 Series Indoor Gas Fireplace
Part No. XG0771 - 070111
f i r e f e a t u r e
Installation Of Electrical Supply
The C-View Residential Fireplace is supplied with an external electri-
cal Control Panel pre-wired by the factory. The power control box
is connected to the replace with a 20 foot long 6 conductor cable
that will communicate with the replace.The control panel should be
located in a location that would be assessable when the replace in
nished.
The power cord from the power vent module pugs into the side of this
panel. A 20 foot low voltage wire is attached and connected to this
panel as well. Connect a single pole On/Off switch (Black and White)
to these two wires at a location of your choice, (See Installing the
Remote Switch).
Installations in Canada must be electrically grounded in accordance
with CSA C22.1 Canadian Electrical Code Part 1 and/or Local Codes.
Installations in the USA must be electrically grounded in accordance
with local codes or, in the absence of local codes, with the National
Electrical Code, ANSI/NFPA 70-1987.
Installing The Remote Switch
The C-View Residential Fireplace may be connected to a wall switch
or a hand-held remote. The valve operates on a 24V circuit. DO NOT
connect the gas valve to an external circuit.
The external electrical panel supplied with the replace is equipped
with a 20 foot low voltage wire, for connecting to a wall switch of your
choice. Should you require a longer switch wire, replace this wire to
any length with a wire of equal quality. Additional length are available
upon request.
Wall Switch
Figure 20. C-View Residential Power Vent Module
Left-sideView
Power Vent
Speed Control
Power Vent
Speed Control
Right-sideView
LED Indicator
Fuse
110V Power Supply
Wall Switch
6 - conductor
communication
cable
Figure 20a. (Remote Switch Wire connection)
Gas Control Wiring
Air Proving Switch
Vent Speed Control
Terminal Block
Power Vent Motor
Indicator light
Fuse
Ignitor operation Lights
110V Power Supply
Wall Switch
Pre-purge Module
Post-purge Module
CAUTION!
The valve has a 1/2 minute Time-On Delay to clear All possible
build up of burned gas within the System.
After this Time-On Delay the replace will proceed with the Initi-
ated Start-Up Sequence has completed.
Installation
Control Panel / Top View
Figure 19a. (Control Panel Overview)
Figure 19. (Fireplace to Control Panel Harness)