Owner`s manual
Page 5
C-View Residential R520-R620 Series Indoor Gas Fireplace
Part No. XG0771 - 070111
f i r e f e a t u r e
8” & 10” Vent
Slip Section
12”Min Height
Power Vent
Frame
One
run for
Horizontal
or
Vertical
Installation Required.
Power Vent Frame,
Min. 10”x 10” for 8”
Vent. 12”x 12”
Frame for 10” Vent
Power Vent
Termination
10” (8“ Vent)
12” (10 Vent)”
10” (8“
Vent)
12” (10”
Vent)
Horizontal
Power Vent
Termination
Installation
Vent Installation
Before installing the the rough-in kit on your roof or wall install the
electrical cord model EPVH-10 to model EPVH-100 and connect it to
the electrical control panel that was supplied with the replace. Do not
attach the electrical wire to the exterior of the vent.The vent will get
hot and may damage the wire.
Install the power vent rough-in kit in its predetermined location and
install the vent system from the rough-in kit to the replace. When the
vent is near the replace you should have a male end aiming towards
the replace connection which also has a male connection.
Vertical EPVRR (Top Vent) Venting & Terminations, P. 5-7.
Horizontal EPVRW (Wall Vent) Venting & Terminations, P. 7-9.
Figure 2. Typical C-View Residential Vertical (Top Vent) Power
Vent Coaxial conguration.
EPVRR Vertical
Power Vent
EPVRW
Horizontal
Power Vent
Vent Terminations
Selecting A Termination Location
Before installing the termination or venting, check to ensure the
planned termination location is acceptable and meets basic require-
ments shown in Figure 3, and Appendix A ( Termination Locations).
Installing the Residential’s Terminations with Frame
1. Frame the termination opening for replace models, R520 and
R620, Pages 6 to 9. (Vertical & Horizontal Vent Runs)
2. Fasten the termination and its frame in place using a minimum of
4 screws, See Figure 2 below.
Cautions:
Vent terminations can be very hot. The termination is to be
installed higher than 7 feet above a public walkway.
Do not obstruct, or attempt to conceal, the vent termination.
These actions will affect the operation of the replace, and may be
hazardous.
In heavy snow areas, take extra care to prevent snow buildup
from obstructing the vent termination.
Figure 2a. C-View Residential Series Control Box / Power Vent
Wire Routing Diagram
Locating the Power Vent Control Box
Locate the Power Vent Control Box in an accessible location. The
location should be where maintenance, adjustments and service may
be made easily.
Control
Box
Horizontal
Power Vent
Termination
Vertica
l
Power Vent
Termination
One Control Cable Installation
required for either Horizontal
or Vertical Termination Vent
110Vac 15A Supply
Current from
Distribution Panel
Wall Switch
Power
Vent