Owner`s manual

Page 8
C-View Residential R520-R620 Series Indoor Gas Fireplace
Part No. XG0771 - 0070111
f i r e f e a t u r e
Installation
Step 7.
Install the Power Vent Module. Place the Power Vent Module
over the stainless steel cover ange and vent pipe, aligning the
Power Vent into nal position. Ensure the Harness is placed
down in the Rough-in box when placing the Power Vent Module.
The Power Vent will sit ush with the stainless steel cover if
installed correctly.
Figure 4g. (Installation of Power Vent Module)
Install Power Vent Module
with Power / Communication
Harness
Vertical Roof Top
Power Vent
Vertical Roof Top
Power Vent Rough-in
Kit
Step 5.
Install the Power Vent, Roof-top Stainless steel cover over the
Installed Rough-in Kit. (You can see the Electrical harness con-
nector in the top right corner).
Figure 4e. Figure 4f.
Step 6.
Install the Power Vent Module Power / communication harness.
Hold the Power Vent in close proximity of the assembled Chase,
(with stainless steel cover attached) and plug in the Power Vent
communication / Power Cord. (Note the direction and orientation
of the plug socket). (See Figure 4e & Figure 4f)
Electrical Harness
from Power Vent
Step 3.
Install the Power Vent Rough-in Kit. Pull wire harness through
the supplied hole in the bottom corner of the rough-in box, and
snap into the slot provided, (See gure 4b inset).
Figure 4c. (Fasten Rough-in Kit to framing)
Step 4.
Install fasteners around perimiter of Rough-in Kit. (Holes supplied
for ease of installation)
Install Fasteners around
perimeter of Rough-in Kit
Figure 4d. (Installed Stainless steel cover)
Figure 4b. Installation of Rough-in Kit
Electrical Harness
Power Vent
Rough-in Kit
Electrical Harness
Connector Location
Inset