Full Product Manual

WPC FlooringInstallation and Maintenance
Please contact your local dealer for questions and further information
!
1!
WPC LUXURY VINYL FLOORING
Installation and Maintenance
PLEASE READ CAREFULLY BEFORE INSTALLATION
FOR BEST RESULTS:
Because this flooring is made to replicate the look of a natural product with natural variations in color and texture for the
best results, shuffle planks from different cartons and avoid installing similar boards next to one another.
SUBFLOOR PREPARATION:
The subfloor must be level, dry, and free of imperfections. An uneven subfloor will cause instability throughout the flooring
and premature damage.
PRE-INSTALLATION JOBSITE REQUIREMENTS
Carefully examine the flooring prior to installation for color, finish, and quality. Ensure adequate lighting for proper
inspection of the product prior to installation. If the flooring is deemed unacceptable by the purchaser, contact your nearest
dealer immediately to arrange for replacement parts. The manufacturer does not accept responsibility for flooring installed
with visible defects. Prior to installation of any flooring, the installer must ensure that the jobsite and subfloor meet the
requirements previously mentioned. The manufacturer is not responsible for flooring defects caused by unsatisfactory
jobsite and/or subfloor conditions.
Crawl spaces must be a minimum of 18” (46 cm) from the ground to the underside of the joists. A black polyethylene film
ground cover of 6-20 mm is to be used as a vapor barrier with joints lapped 6” (16 cm) and sealed with moisture resistant
tape. The crawl space should have a perimeter venting equal to a minimum of 1.5% of the crawl space square footage. These
vents should be properly located to foster cross ventilation. Where necessary, local regulations take precedent.
Room temperature and humidity of installation area should be consistent with normal, year-round living conditions for at
least one week prior to installation. Maintaining an optimum room temperature of 70° F and a humidity range of 30-50% is
recommended.
PLEASE NOTE: The flooring should be one of the last items installed in any construction or remodel projects.
PRE-INSTALLATION SUBFLOOR REQUIREMENTS
Acceptable subfloor types:
§ CDX underlayment grade plywood (at least ½” thick)
§ Underlayment grade particleboard
§ OSB (at least ¾thick)

Summary of content (5 pages)