Installation & Assembly

1 / 3
Flooring Installation & Maintenance
Before Installation:
PLEASE CAREFULLY EXAMINE THE FLOORING YOU PURCHASED BEFORE
INSTALLATION, INCLUDING COLOR, SURFACE, FINISH AND QUANTITY ETC.
CONTACT THE DEALER IMMEDIATELY IF THE FLOORING IS NOT ACCEPTABLE.
COMPENTATION AND SERVICE FROM MANUFACTURER WILL NOT BE OFFERED
ONCE THE FLOORING HAS BEEN PERMANENTLY INSTALLED.
Glue down installation
Preparation for tools and materials:
Broom or vacuum, Moisture meter, Safety gloves, Tape measure, Hand saw, Chalk,
Electric miter saw, Cleaner, Hammer, Pry bar, Wood flooring adhesive, rags, Square
notch trowel, Mineral spirits, Adhesive remover, Straight edge.
1. Mark out a straight line parallel to the chosen wall, allowing a 10 mm gap for
expansion. It may be necessary to scribe the first row of boards to achieve correct
alignment.
2. Once the first row of boards is correctly aligned and glued in place, weight them
down while the glue sets. Any surplus glue that may seep out onto the surface of the
wood must be removed immediately with a damp cloth. The glue should not be applied
in the groove or the tongue of the flooring.
3. Continue to fit the boards from left to the right. Always stagger the end joins by a
minimum of 150mm and a maximum of 300mm. Measure and trim the last board to fit,
allowing for the 10mm expansion gap. Where possible, use cut-offs to start the next
row.
4. Flooring straps can be used to pull boards together and hold them in place whilst the
glue dries.
5. The expansion gap of 10mm must be maintained during installation.
6. For the last row of boards, you can use the sandwich technique to measure the width
of board required, ensuring that the row is not less than 10cm in width.
7. All pipes, pillars, frames etc must be cut around to provide suitable expansion gaps.
Nail or staple down installation
Preparation for tools and materials:
Broom or vacuum, Moisture meter, Safety gloves, Tape measure, Hand saw, Chalk,
Electric miter saw, Cleaner, Hammer, Pry bar, Drill, Air hose, Tapping block, In-line
air regulator, Compressor, Pneumatic nailer/stapler.

Summary of content (3 pages)