User`s manual
CHAPTER 3.0 Wiring and Installation  3-53
CDS7324 (FORMERLY LSF-0819)   
Rev. A  INSTALLATION & USER’S MANUAL 
3.11.3 Power Sequencing on Startup 
The timing of the digital inputs ENABLE and PWR_RDY must be considered carefully for proper power-on 
sequencing. 
Logic Power applied 
24Vd.c. 
A.C. Mains applied to 
DS2100 
Drive Ready Relay 
output of DS2110 
ENABLE input 
Minimum Time from Logic power 
to Drive Ready 6 seconds 
A.C. Mains to 
Drive Ready < 4s
Drive Ready activated to 
ENABLE  transition can 
be < 6ms 
Figure 3.46 Power Sequencing control using Drive Ready Relay and ENABLE 
WARNING - It is UNSAFE to use the Drive Ready output as a direct control for the 
ENABLE. The Drive Ready output will switch off when a fault occurs, and will switch on 
when the fault is cleared. This may result in an inadvertent enable of high power to the 
DS2110 high power amplifier, resulting in unexpected high voltage application or motion. 
The System Motion Controller should examine the state of the Drive Ready relay output 
separately, and then enable the DS2110 high power amplifier if appropriate 
A.C. Mains applied 
to DS2110 










