Operating instructions

Part 2: Installation
Figure 7
CAUTION:  Pull all slack in the wiring as
 you lift the pole into position
 to keep from pinching and
 possible damage.
5. Ensure that the pole is vertical on all sides. Use a bubble level or 
 plumb bob to check.
5. Slowly lift the pole into the upright position, aligning the holes of 
 the Base Plate with the Bolts in the concrete pad (Figure 7).
Part 2: Installation
Figure 8
6. Secure the pole to the pad with fasteners (Figure 8).
Nut
Lock Washer
Flat Washer
Anchor Jig Assembly
Anchor Jig Kit Parts List
Single Straps  (4)
Cross Strap  (1)
3/4" - 10 Bolts  (4)
3/4" Flat Washers  (4)
3/4" - 10 Hex Nut  (20)
Lock 
Washers  (4)
         Jig Assembly
1 "
6"*
Figure 1
1 1/2"
1. Thread two (2) nuts onto each of the (4) bolts (Figure 1). The end 
 with 6" of clearance will be the top of the Anchor Jig, the end with 
 1 1/2" clearance will be the bottom.
NOTE:  Because of surface conditions it may be necessary to use 
 leveling nuts. See step 5 below for information.
8 9
10 11









