User manual
6 Mounting Planning Lines
© 2010 Moog GmbH User Manual RKP-II (CA53461-001; Version 2, January 2010) 35
Procedure:
1. Mount the specified half of the coupling to the pump's drive shaft as per 
the information provided by the coupling manufacturer.
2. Make sure that the connection and mounting surfaces are clean. 
- If not, clean the connection and mounting surfaces using suitable 
cleaning agents. 
- Use suitable cleaning rags. 
- Do not allow the cleaning agent to penetrate into the hydraulic 
circulation loop.
3. Ensure that the coupling hub is tightened to the drive shaft or that the 
drive shaft is lubricated continuously to prevent wear from vibration.
4. Transport the pump to the mounting location.
5. Mount the coupling to the drive according to the information provided by 
the coupling manufacturer.
6. Fasten the pump with the coupling at the mounting location. Tighten the 
mounting screws with the adequate tightening torque crosswise. 
Ö Chap. "12.2 Tightening Torque", Page 63
7. For bell housing mounting: Check the coupling's axial clearance as per 
the information provided by the coupling manufacturer.
8. For mounting a flange: Align the pump supports in the direction of the 
drive.
9. For elastic couplings: After completing the mounting, check the drive to 
make sure it does not vibrate.
6.3 Planning Lines
Planning Lines
Suction Line
• Short suction lines with wide inside diameters are needed to ensure that 
the noise output is low.
• Suction speed < 1 m/sec.
The threaded bore on the pump's drive shaft can be used to mount 
the coupling. 
Only bolt the pump down after the coupling has been mounted 
correctly.
In order to minimize the development of noise from the transmission of 
structure-borne noise, observe the following:
• Use hoses instead of pipes.
• Secure pipes with elastic clamps.
WARNING Damage to property from cavitation!
Lack of pressure in the suction line may lead to the formation 
of air bubbles in the operating fluid and as a result may lead to 
severe damage to the pump.
• Configure the layout of the suction lines so that the inlet 
pressure cannot be any lower than the minimum of 
0.8 bar absolute at the suction port.
• Ensure that the operating fluid has the correct viscosity.










