Operation Manual

14
L
50
927
860
20
Ø60.8
15
25
25°
25
95
Seal
Rubber
sleeve
Clamp
Air
restrictor
ring
Ø 60-100 Coaxial pipe
L= 0.5 m
L= 1 m
HORIZONTAL FLUE Ø 60-100mm COAXIAL
5.5 AIR/FLUE SYSTEM
The standard flue kit supplied with the FEB-24E is a 1m horizontal coaxial air/flue kit as shown below.
There are various other options available, including a vertical flue kit and other variations on the horizontal
kit. Please ask for details. Never use a flue system which is not specifically approved for use with this appli-
ance.
The horizontal pipe may be cut down to the length required. The flue must be fitted with a .2° or 3° down-
wards incline to prevent any water or condensation from entering in the boiler.
Where a short run of less than 1 m is used, such as in a caravan holiday home, the air restrictor ring
must be inserted into the boiler flue spigot before fitting the elbow.