4.6 Inspection and Maintenance
Table 4-6 below, lists the recommended maintenance
schedule to keep your ProStar performing optimally.
Schedule Maintenance Items
2 weeks after installation
Re-tighten power terminal
connections to specified
torque values.
3 months after installation
Re-tighten power terminal
connections to specified
torque values.
Monthly, or After Each
Equalization
Inspect the battery bank.
Look for cracked or
bulging cases, and corroded
terminals.
For wet cell (flooded type)
batteries, make sure the
water level is correct. Wet
cell water levels should be
checked monthly or accord
-
ing to the manufacturer’s
recommendations.
Table 4-6. Maintenance Schedule (Cont.)
Schedule Maintenance Items
Annually
Clean the heatsink fins with a
clean, dry rag.
Inspect all wiring for
damage or fraying.
Inspect for nesting insects.
Re-tighten all wiring
terminal connections to
specified torque values.
Inspect the system earth
grounding for all com-
ponents. Verify all grounding
conductors are appropriately
secured to earth ground.
Table 4-6. Maintenance Schedule (End)