Load Control with Sure Sine Inverter

page 3 of 3ALL.DIG.TS_Load_SureSine.01.EN
© 2013 Morningstar Corporation. All rights reserved.
page 3 of 3
Diagram #2 (applicable with SI-300)
IMPORTANT:
This is not intended to be a complete system diagram; fusing, discon-
nects, and grounding should comply with local electric codes.
Notes:
The Inverter cannot be connected directly to the Load +/- terminals of the TriStar Load Controller. Instead, •
it is connected directly to the battery bank.
In order to use the TriStar Load Control with the inverter connected directly to the battery bank, a Relay •
must be used.
A Relay is used as a contactor for the Remote ON/OFF terminal present on the SureSine 300. The TriStar •
controller when the Relay turns ON/OFF. Via the Relay connected to the Remote terminal, the SureSine AC
output is turned ON/OFF.
For detailed installation information, please consult the respective product manuals (TriStar, SureSine).•
12 Volt
+
-
+
-
GND
TriStar
(Load Control Mode)
Normally
Open (N/O)
Relay
SureSine Inverter
AC Loads
Load -
Load +
Battery -
Battery +
GND
GND
BLACK
WHITE
FUSE
FUSE
FUSE
Remote ON/OFF