User's Manual
Table Of Contents
- 1.Safety Precautions
- 2.System Description
- 2.1About This Manual
- 2.2Introduction
- 2.3System Features
- 2.4Physical Description
- 2.5System Description
- 2.6Consecutive Point Architecture
- 2.72 + 0 (East-West) Configuration
- 2.8Spanning Tree Protocol (STP)
- 2.91+1 Protection
- 2.101 + 1 Multi-hop Repeater Configuration
- 2.11Data Interfaces
- 2.12Crosspoint Switch
- 2.13Power Management
- 2.14Event-HD Software and Network Management
- 2.15System Loopbacks
- 3.Installation
- 3.1Unpacking
- 3.2Notices
- 3.3PRE-INSTALLATION NOTES
- 3.4Back-to-Back Bench Testing
- 3.5Overview of Installation and Testing Process
- 3.6Site Evaluation
- 3.7Installation of the Event-HD
- 3.8Quick Start Guide
- 3.9SDIDU™ Service
- 4.Summary Specification
- 5.Rear Panel Connectors
- 5.1DC Input (Power) Connector
- 5.2Ethernet 100BaseTX Payload Connector 1-2
- 5.3SONET Payload Connector
- 5.4STM-1 Payload Connector
- 5.5DVB/ASI, DS-3, E-3, STS-1 Payload Connector
- 5.6NMS 10/100BaseTX Connector 1-2
- 5.7Alarm/Serial Port Connector
- 5.8ODU Connector
- 5.9T1/E1 - Channels 1-2 Connector
- 5.10T1/E1 - Channels 3-16 Connector
- 5.11USB
- 5.12Voice Order Wire
- 5.13Data Order Wire
- 6.Appendix
3. Installation 5
• Confirm
• Line of sight for each link
• Event-HD ODU mounting locations
• Site equipment locations
• Cable routes
• Any other potential RF sources
• Prepare site drawings and record site information
3.6.1Preparing for a Site Evaluation
The following tools are required to perform a site evaluation:
• RF and network design diagrams (as required)
• Binoculars
• Global positioning system (GPS) or range finder
• Compass
• Measuring tape and/or wheel
• Digital camera
• Area map
• Aerial photograph (if available)
• List of potential installation sites (“targeted buildings”)
The following tasks must be completed prior to performing a site evaluation:
• Prepare the initial network design by performing the following:
• Identify potential buildings by identifying targeted customers (applicable if you’re
a service provider)
• Identify potential links by selecting buildings based on the high probability of line
of sight
• Arrange for access with the facility personnel into the buildings, equipment rooms,
and architectural plans to become familiar with the location of all ducts, risers, etc.