User's Manual

Table Of Contents
3. Installation 5
Confirm
Line of sight for each link
Event-HD ODU mounting locations
Site equipment locations
Cable routes
Any other potential RF sources
Prepare site drawings and record site information
3.6.1Preparing for a Site Evaluation
The following tools are required to perform a site evaluation:
RF and network design diagrams (as required)
Binoculars
Global positioning system (GPS) or range finder
Compass
Measuring tape and/or wheel
Digital camera
Area map
Aerial photograph (if available)
List of potential installation sites (“targeted buildings”)
The following tasks must be completed prior to performing a site evaluation:
Prepare the initial network design by performing the following:
Identify potential buildings by identifying targeted customers (applicable if you’re
a service provider)
Identify potential links by selecting buildings based on the high probability of line
of sight
Arrange for access with the facility personnel into the buildings, equipment rooms,
and architectural plans to become familiar with the location of all ducts, risers, etc.