User's Manual

10-2 MTR2000 MOTOTRBO Digital Upgrade: Unpacking
The information below is an overview for installing the base station/repeater and ancillary equipment.
Unpacking and inspecting the equipment
Mechanically install the equipment at the site
Make necessary electrical and cabling connections:
- Audio
-GPIO
- Ethernet
Perform Alignment
Perform Configuration
Perform a post-install functional checkout test to verify installation
10.2 Unpacking
This section describes the procedures to unpack the new front bezel, new SCM module, new Exciter
and Receiver modules from the packaging prior to installing them.
10.2.1 Equipment Unpacking and Inspection
10.2.1.1 Introduction
The new front bezel, new Exciter module, new Receiver module and new SCM module may be
shipped by either air freight or electronic van (as specified by customer), except where noted.
Thoroughly inspect the equipment as soon as possible after delivery. If any part of the equipment is
damaged during transit, immediately report the extent of the damage to the transportation company
and to Motorola.
10.2.1.2 Unpacking Equipment
The new front bezel, new Exciter Module, new Receiver Module and new Station Control Module are
packed in four separate boxes which are packed together in a common box. The individual boxes
are cushioned between corrugated cardboard in a common box.
Note
For the correct procedure in handling static-sensitive parts, refer to Section 14.4 on page
14-3.
Note
Once the upgrade is performed, the Wireline and Auxiliary I/O board functionality will no
longer be supported.
To avoid damage to the parts, be sure to observe proper electrostatic
discharge precautions when modules are removed from the base
station/repeater.
APPLICANT: MOTOROLA
EQUIPMENT TYPE: ABZ89FC3795
EXHIBIT D1-4