User's Manual

24 68P80801E35-A 9/1/2001
Troubleshooting EBTS System Manual - Vol 2
Generation 2 Single Channel BR Station Verification Procedures
3. Enable Global Synchronization.
4. Disable System Gain.
NOTE
This step should only be performed if the Base Radio
is being connected directly to the Base Radio Antenna
ports. If verication is being performed at the top of
the rack (adding an RFDS), disregard the above
command.
5. Verify the R2660 signal level.
eld> es -orx_all -tglobal
eld> freq -orxch1 -f810
eld> sge -orx_all -soff
eld> enable -orxch1 -dbr1 -son
eld> ppc -orych1 -mchn -s1
eld> ppr -orxch1 -r1 -a100