APPLICANT: MOTOROLA INC. EQUIPMENT TYPE: ABZ89FC5800 INSTRUCTION MANUALS The Preliminary Installation manual for this base radio is provided. Upon request, final manuals will be sent to the commission and/or telecommunication certification body (TCB) as soon as they become available. All of the descriptions and schematics in this filing are up to date and will be included in the instruction and/or service manuals.
APPLICANT: MOTOROLA INC. EQUIPMENT TYPE: ABZ89FC5800 INSTRUCTION MANUALS Draft copy of the of the front matter of the following instruction manual is enclosed with this submission: 68P81003Y71-O ........................................................ 6.2 First Draft for Simulcast Hardware Installation Other system and radio / configuration service software manuals are available to support the product and system in operation. They can be provided to the Commission upon request.
6.2 First Draft for Simulcast Hardware Installation © November 2002 Motorola, Inc. All Rights Reserved Printed in U.S.A.
Computer Software Copyrights The Motorola products described in this document include a copyrighted Motorola computer program. Laws in the United States and other countries, as well as International Treaties, preserve for Motorola the exclusive rights for Motorola’s copyrighted computer programs, including the exclusive right to copy, reproduce, distribute, or otherwise transfer said computer program(s).
Table of Contents Contents Simulcast Hardware Installation What Is Covered In This Manual? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Helpful Background Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Related Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xxi xxii xxii Understanding the Installation Process Mechanical Installation Process . . . . . . . . . . . . . . . . . .
Contents FCC Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . Electromagnetic Safety Requirements. . . . . . . . . . . . . . . . . . . . OSHA Related Safety Requirements . . . . . . . . . . . . . . . . . . Human Exposure Compliance for RF Energy . . . . . . . . . . . . . . List of References . . . . . . . . . . . . . . . . . . . . . . . . . . . List of Required Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . General Tools . . . . . . . . . . . . . . . . . . . . . . . . . . .
Contents Rack Space Requirements . . . . . . . . . . . . . . . . . . Ventilation . . . . . . . . . . . . . . . . . . . . . . . . . Installing the TRAK 9100 Simulcast Site Reference . . . . . . . . . . Overview of the TRAK 9100 Simulcast Site Reference . . . . . . Functional Description . . . . . . . . . . . . . . . . . . . TRAK 9100 Hardware Modules . . . . . . . . . . . . . . . Installing the TRAK 9100 Simulcast Site Reference in the Rack . . Grounding the Chassis . . . . . . . . . . . . . . . . . . .
Contents Installing the Prime Site (10Base-T) Overview of a Digital Simulcast Prime Site . . . . . . . . . . . . . . . . . Prime Site Configuration . . . . . . . . . . . . . . . . . . . . . . . Prime Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . Prime Site with a Co-Located Remote Site . . . . . . . . . . . . . Prime Site with a Mutual Aid Station . . . . . . . . . . . . . . . . Installing the MTC 9600 Site Controller . . . . . . . . . . . . . . . . . .
Contents Wiring for Power . . . . . . . . . . . . . . . . . . . . . . . Cabling the Procurve Switch . . . . . . . . . . . . . . . . . . . . Operating and Environmental Specifications for the Procurve Switch . Powering Up the Procurve Switch . . . . . . . . . . . . . . . . . Testing the Switch by Resetting It . . . . . . . . . . . . . . . Installing the Channel Bank . . . . . . . . . . . . . . . . . . . . . . Overview of the Channel Bank . . . . . . . . . . . . . . . . . . .
Contents Connecting the STR 3000 Rack to Ground . . . . . . . . . . Connecting Power to the STR 3000 Rack . . . . . . . . . . . Installing the Expansion Cabinets . . . . . . . . . . . . . . Cabling the STR 3000 Base Radio Rack . . . . . . . . . . . . . Connecting the Ethernet Cables . . . . . . . . . . . . . . . Connecting the Transmit Cables . . . . . . . . . . . . . . . Connecting the Receive Cables . . . . . . . . . . . . . . . Connecting the V.24 Cabling. . . . . . . . . . . . . . . . .
Contents Installing the Simulcast Remote Site Router . . . . . . . Overview of the Simulcast Remote Site Router . . . Installing the Simulcast Remote Site Router. . . . . Grounding the Chassis . . . . . . . . . . . . Wiring for Power . . . . . . . . . . . . . . . Cabling the Simulcast Remote Site Router . . . . . Powering Up the Simulcast Remote Site Router . Operating Specifications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Contents Average Heat Dissipation for an STR 3000 Rack . . . . . . . Specifications for the Tower Top Amplifier . . . . . . . . . . . . Installing the TRAK 9100 Simulcast Site Reference . . . . . . . . . . Overview of the TRAK 9100 Simulcast Site Reference . . . . . . Hardware Modules in the TRAK 9100 Simulcast Site Reference Installing the TRAK 9100 Simulcast Site Reference in the Rack . . Grounding the Chassis . . . . . . . . . . . . . . . . . . . Wiring for Power . . . . . . . . . . . . . . . . . . . .
Contents Cabling the NFM RTU at the Prime Site . . . . . . . . . . Cabling the NFM RTU at the Remote Site . . . . . . . . . Powering Up the NFM RTU . . . . . . . . . . . . . . . . . . Installing the NFM MultiPort RTU . . . . . . . . . . . . . . . Connecting Power to the NFM MultiPort RTU . . . . . . . Grounding the Chassis . . . . . . . . . . . . . . . . . . Cabling the NFM MultiPort RTU. . . . . . . . . . . . . . . . Cabling the NFM MultiPort RTU at the Prime Site . . . . .
Contents This page intentionally left blank.
List of Figures List of Figures Figure 1-1: Front View of the Equipment Cabinet . . . . . . . . . Figure 1-2: Rack Ground Bus Bar in the Equipment Cabinet . . . . Figure 2-1: Lengths and Angles for Lifting Using the Eyenuts . . . Figure 2-2: Proper Alignment of the Eyenuts . . . . . . . . . . . Figure 3-1: Digital Simulcast Subsystem Prime Site . . . . . . . . Figure 3-2: Prime Site with Co-Located Remote Site . . . . . . . Figure 3-3: Prime Site with a Mutual Aid Base Station . . . . . . .
List of Figures Figure 5-10: Power Supply Module with LED Indicators. . . . . . . Figure 5-11: Rear View of TRAK 9200 . . . . . . . . . . . . . . . Figure 5-12: Front View of the Channel Bank . . . . . . . . . . . . Figure 5-13: Rear View of the Channel Bank . . . . . . . . . . . . Figure 5-14: Power Connections on the Channel Bank . . . . . . . . Figure 5-15: AC Input to the Power Supply on the Channel Bank . . . Figure 5-16: DC Input to the Power Supply on the Channel Bank . . .
Preliminary Model and Options selection Procedure GENERAL INFORMATION ! 700 MHz STR 3000 (Tx 764.00625 – 775.99375, Rx 794.00625 – 805.99375) ! 6 Channels per Rack ! 6 Base Radios per Rack, 30 Base Radios per Site ! 100 Watt RF Power Amplifier ! Cabinet Height: 43 RU, 83.
Preliminary 700 MHZ STR 3000 ORDERING MATRIX Super Model and Option Description Nomenclature STR 3000 Radio Subsystem SQM02SUM0011A Orderable Options: Choose only one required BR option from the following list.
Preliminary Field Replacement Units (FRUs): 700 MHz STR 3000 Base Radio T6724A Add: ASTRO 25 700 MHz Simulcast Trunking Software CA00025AB Add: ASTRO 25 700 MHz ISR Software CA00158AA Add: ASTRO 25 700 MHz P25 Limited Digital Conventional Software CA00242AA FRU: STR3000 EXCITER MODULE 700 MHZ DLN6520A FRU: STR3000 RECEIVER MODULE 700 MHZ DLN6521A FRU: 100W 700 MHZ LINEAR PA DLN6522A FRU: POWER SUPPLY BOARD DLN1102B FRU: SIMULCAST 4 and 6 WAY TRAY CLF1775A FRU: SIMULCAST 4 and 6 WAY TRAY w/T
Preliminary PRELIMINARY 700 MHZ STR 3000 SPECIFICATIONS GENERAL PERFORMANCE Supermodel Number SQM02SUM0011A Number of Channels 1-6 channels Number of Cabinets 1 Cabinet Height 43 RU, 83 in. (210 cm) Footprint * (WxD) 24x24 in. (60 x 60 cm) System Weight 795 lbs (361 kg) Power Requirements -48 VDC (43-60 VDC) Temperature Range -30° to +60° C (-22°F to 140°F) EBTS thermal loading: BRs 1 2 3 4 5 6 (Preliminary) Typ.
Preliminary BASE RADIO Dimensions 8.75x19x16.5 in. (222x483x419mm) Weight 73 lbs Power Reqts -48 VDC (42-60 VDC) # of Frequencies 1 Freq Generation Synthesized Digital Channel Spacing 12.
Preliminary TRANSMITTER Frequency Range 764-776 MHZ Average Power Output (6 Ch Cavity Combiner) 150 kHz 250 kHz 6W-19W per carrier 8W-27W per carrier (Preliminary) Occupied Bandwidth 8.
Preliminary RECEIVER Frequency Range 794-806 MHz Sensitivity Static Bit Error Rate (BER) 5% -121dBm** Intermodulation Rejection (Per TIA methods of measurement) 80 dB Adjacent Channel Rejection Digital Reference 60 dB Spurious and Image Response Rejection 100 dB*** Preselector Bandwidth 30 MHz Bit Error Rate Floor Signal Displacement Bandwidth 0.01% Frequency Stability 1 kHz Intermediate Stability 1st 2nd RF Input Impedance ** External Reference Required 73.
Preliminary TRANSMIT COMBINER SYSTEM Transmitter Combiner 700 MHz Frequency Range 764-776 MHz Insertion Loss (includes isolator) 2 port Cav Combiner @ 150KHz 2 port Cav Combiner @ 250KHz 4 port Cav Combiner @ 150KHz 4 port Cav Combiner @ 250KHz 6 port Cav Combiner @ 150KHz 6 port Cav Combiner @ 250KHz 8 port Cav Combiner @ 150KHz 8 port Cav Combiner @ 250KHz 10 port Cav Combiner @ 150KHz 10 port Cav Combiner @ 250KHz 12 port Cav Combiner @ 150KHz 12 port Cav Combiner @ 250KHz Typical 4.0 dB 3.0dB 4.
Preliminary RECEIVER MULTICOUPLER Frequency Range 794-824 MHz Noise Figure Typical 3.5 dB Maximum 4.
Chapter 1 Understanding the Installation Process This chapter provides a general mechanical installation process and some general guidelines when installing an equipment cabinet or rack. The following topics are included in this chapter: • "Mechanical Installation Process" on page 1-1 • "Mechanical Installation Guidelines" on page 1-3 Mechanical Installation Process Process 1-1 provides guidelines for installing hardware components into a rack in a simulcast subsystem.
Mechanical Installation Process Chapter 1: Understanding the Installation Process Process 1-1 1 Installing Hardware Components Place each piece of equipment carefully in the area designated on the site plan. Verify that the equipment rack is bolted to the floor and ready for equipment installation. See "Verifying Proper Installation of the Equipment Cabinet or Rack" on page 1-5. 2 If your system was racked and tested by Motorola CCSI, continue with step 7.
Simulcast Hardware Installation Mechanical Installation Guidelines Mechanical Installation Guidelines Hardware components are typically installed into a equipment cabinet or a standard 48.26 cm (19-in) rack.
Description of an Equipment Rack Figure 1-1 Chapter 1: Understanding the Installation Process Front View of the Equipment Cabinet Figure 1-2 shows the Rack Ground Bus (RGB) bar in the equipment cabinet, which is used to ground the components.
Simulcast Hardware Installation Figure 1-2 Verifying Proper Installation of the Equipment Cabinet or Rack Rack Ground Bus Bar in the Equipment Cabinet Verifying Proper Installation of the Equipment Cabinet or Rack Procedure 1-1 explains how to verify that the equipment cabinet or rack is ready for hardware component installation.
Installing Equipment in the Equipment Cabinet or Rack Procedure 1-1 Chapter 1: Understanding the Installation Process How to Verify Proper Equipment Cabinet or Rack Installation 1 Verify that the equipment cabinet is properly bolted to the floor. 2 Verify that slide rails and cage nut screws on the left and right sides of the cabinet or rack are installed at the proper bracket hole locations, as shown for the equipment cabinet in Figure 1-1.
Chapter 2 Installing the Simulcast Subsystem Hardware This chapter provides general information for installing an ASTRO® 25 digital simulcast subsystem.
General Safety Precautions Chapter 2: Installing the Simulcast Subsystem Hardware General Safety Precautions Observe the following general safety precautions during all phases of operation, service and repair of the equipment described in this manual. The safety precautions listed below represent precautions regarding certain known hazards. Follow these warnings and all other safety precautions necessary for the safe operation of the equipment.
Simulcast Hardware Installation Maintenance Requiring Two People • Never store combustible materials in or near equipment racks. The combination of combustible material, heat and electrical energy increases the risk of a fire safety hazard. Maintenance Requiring Two People Identify maintenance actions that require two people to perform the repair. Two people are required when: • A repair has the risk of injury that would require one person to perform first aid or call for emergency support.
Lifting Equipment Racks Chapter 2: Installing the Simulcast Subsystem Hardware Lifting Equipment Racks Lifting Equipment Racks Horizontally In some cases, the equipment racks are laid down horizontal to facilitate the shipping process. Use the appropriate lifting apparatus to lift the racks upright to comply with all applicable health and safety regulations, and any other regulations applicable to lifting heavy equipment.
Simulcast Hardware Installation Site Preparation Process 2-1 Installing Equipment within a Digital Simulcast Subsystem 1 Prepare each site to comply with the Motorola requirements and specifications for the equipment, as listed in the Standards and Guidelines for Communication Sites (68P81089E50) manual. Other codes and guidelines that may apply to the location must also be met.
General Installation Guidelines Table 2-1 Chapter 2: Installing the Simulcast Subsystem Hardware Activities for Site Preparation Activity Description of Activity Chapter Reference in the Standards and Guidelines Manual Review the site plan. • Prevents potential on-site and off-site interference by local trunked systems. • Minimizes cable lengths between the RF equipment. • Determines the location of telecom equipment. Determine site access and security.