9.2 Removal of Refrigeration Cycle Components
CAUTION
Before any refrigeration cycle component can be replaced, it is necessary to recover the
refrigerant using standard recovery procedures and equipment.
To prevent oxidation, dry nitrogen should be conducted (flow rate 0.27 gal (1 L/min)) through the
pinch-off tube during any brazing operation.
During any component replacement involving brazing, shield nearby parts with a steel plate, etc.,
to protect them from the flame.
•Evaporator
Capillary tube
Condenser
Compressor
High Pressure Switch
< NOTE >
When replacement of the compressor, attach the two pipes (Pipe 1, Pipe 2) which are packaged
in Compressor Assy as following figure.