User's Manual
Table Of Contents
3
3
Chapter 3 Getting Started
This chapter includes information about installing WE-2100T.
The following topics are covered in this chapter:
Wiring Requirements
Attaching WE-2100T to the Evaluation Board
Circuit Pad for External Connection
Connecting the Power
Connecting to the Network
Connecting to a Serial Device
DI/O Settings
¾ Digital Output LED Circuit Design