Instructions / Assembly

Fiberglass Entry Door
Installation Instructions
Unpack and thoroughly inspect product once received. Any defects or concealed damage
must be reported within 5 days of the initial delivery from the manufacturer. If not being used
for new construction, the product must be thoroughly inspected before removal of the existing
door.
1. ROUGH OPENING INSPECTION AND PREPARATION
• The rough opening should be ¾” wider than the frame width, and ½” higher than the
frame height.
• Check rough opening for plumb, square and level. If it is not, correct as necessary.
• Ensure that slab/suboor is clean, dry and level. A solid, level sub-oor is essential for
proper door unit installation. Scrape, sand and ll as required.
• Clean away all debris before setting door assembly.
2. CAULK SUB-FLOOR AND BOTTOM OF SILL
• Before installation, inspect corners of frame for damage at the joints.
• For added protection against leakage, caulk the frame at the joints.

Summary of content (8 pages)