Specification Sheet

Linear Steam Head
TS00
85 REV 8.20
mr
.
steam
®
Sussman-Automatic Corp
®
hello@mrsteam.com www.mrsteam.com
43-20 34th Street, Long Island City, NY 11101 TEL: 1 800 76 STEAM
9410 S. La Cienega Blvd. Inglewood CA 90301 TEL: 1 800 72 STEAM
MODEL PROJECT INFORMATION
104495
for
MX4,
MX5 and MX6
Notes:
Location:
Architect:
Engineer:
Contractor:
Submitted By:
Date:
®
®
q
BB
q
BN
q
MB
q
ORB
q
PB
q
PC
q
PN
q
SB
(continue on next page)
•Complete
steam room tile construction information is available
from the Tile Council of America, Inc. by purchasing the TCA
Handbook for Ceramic Tile Installation. 864- 646-8453 or
www.tileusa.com. Information on marble steam room
construction is available from the Marble Institute of America
www.marble-institute.com. Failure to follow these instructions
may result in damage to tile,
marble or other materials.
Finished wall surface may be tile, marble, granite or other
steam rated surface.
MrSteam is not responsible for the steam room construction.
Consult with qualified designer, architect or contractor for
steam room construction.
For
Installation assistance please call Customer or Technical support:
East Coast 1-800-767-8326 West Coast 1-800-727-8326
To view an installation video please go to: www.mrsteam.com
This video is for added visual assistance only. Do not install the Linear Steam Head using
the video. Use only these installation instructions for a safe and problem free installation.
Plum bing
must be installed by a qualified and licensed
plumber. Plumbing in a manner that results in traps or
valleys in the pipe may result in a noisy or inoperable
installation.
Plumbing without proper thread sealant may result in a
leak within the wall cavity and cause problems associated
with leaks, moisture and property damage from leaks.
•DO NOT use black iron pipe or galvanized pipe for the
steam line. Use brass pipe or copper tubing only, and in
accordance with national and local plumbing codes.
STEP
6. Run the steam generator for a few steam cycles
to
observe and verify that the steam head, steam head
installation and plumbing are correct and free of leaks.
STEP
7. Insulate steam line and steam head using
insulation
rated 212°F or higher. Insulate the steam head
and piping as required to reduce temperatures within the
wall cavity. DO NOT locate the steam head or plumbing
near any materials, including wiring, devices, or products
that may be adversely affected by elevated temperatures.
Failure to follow these instructions may result in the failure
of materials, including wiring, devices, or products.
STEP
8. After the finished wall surface has been installed
use high
temperature silicone around the steam
outlet as
required to make a waterproof seal. (see Fig. 4)
CAUTIONS
!
Installation Instructions
Cement Board
Thin Set
Finished
Wall Surface
Steam Outlet Face
Silicone
Silicone
STUD
Cement Board
Thin Set
Finished
Wall Surface
Faceplate
Silicone
Silicone
Installation Instructions
4
NOTE: Drawings are for illustrative purposes only. Consult with qualified designer, architect or contractor for steam room construction.
Cement Board
Thin Set
Finished
Wall Surface
Steam Outlet Face
Silicone
Silicone
STUD
Cement Board
Thin Set
Finished
Wall Surface
Faceplate
Silicone
Silicone
Technical Specifications
Number Steam
Generator of Linear Emission
Model Steam Heads Zone
MS90-MS400 1 18”
Super1-Super3 1 24”
MX4-MX6 2 24”
Because the steam
head and direct steam emission
are very hot, locate the steam
head(s) where incidental contact
by the user with the steam head(s)
or direct steam emission cannot
occur.
Linear Steam Head model 104480
is suitable for MrSteam generator
models MS90 – 400, MSSUPER1–3
and MX4-MX6.
Two 104480 linear steamheads must
be used for models MX4, 5 & 6.
Using model 104480 for any steam
generator model larger than the
MX6, or for any non MrSteam
brand generators may result in an
improper installation or hazardous
condition.
For residential use only.
Installed between studs.
Only install the linear steam head
in a horizontal orientation as
shown in installation manual,
PUR 103936.
Quiet, even distribution of steam
No field assembly required
Finished Look
No moving parts
Minimal profile
Aroma Feature
Linear Steamhead Installation:
(34" NPT)
IMPORTANT: Do not disassemble
steamhead. MrSteam’s steamhead
is shipped fully assembled and
requires no additional assembly.
Locate steamhead 6-12 inches above
floor, except for tub/shower enclosures;
install 6 inches above tub top edge.
FOR ILLUSTRATIVE PURPOSES ONLY.
IMPORTANT NOTE: FOR SAFE AND
TROUBLE FREE INSTALLATION
visit mrsteam.com before installation to
download the Installation, Operation and
Maintenance Manual or refer to the manual
provided with the unit.
TS0085 Rev 2.21
104480 For MS90-MSSUPER3
Two Required for MX4, MX5 and MX6
With
Diverter
Steam Room
Interior
Steam
Emission
6”-12”
Above
Floor
Steam Emission
Zone
Finished
Wall
Steam
Emission
Without
Diverter
Steam
Emisson
Zone
Steam Room
Interior
6”-12”
Above Floor
Finished
Wall
1
1
/16
2
1
/4
Linear SteamHead
shown without the
optional faceplate
or diverter.
14”
14-
1
/8 - 19”
5
/8
2-
1
/8
9-
1
/4
Vapor Barrier
Cement Board
Finished
Wall Surface
Silicone
Silicone
Steam Outlet Face
Thin Set

Summary of content (2 pages)