Specification Sheet

Linear Steam Head
®
Installation Instructions: Model 104216
mr
.
steam
®
4
NOTE:
Drawings are for illustrative purposes only. Consult with qualified designer, architect or contractor for steam room construction.
• Complete steam room tile construction information is available from the Tile Council of America, Inc. by
purchasing the TCA Handbook for Ceramic Tile Installation. 864- 646-8453 or www.tileusa.com.
Information on marble steam room construction is available from the Marble Institute of America www.marble-
institute.com. Failure to follow these instructions may result in damage to tile, marble or other materials.
• Finished wall surface may be tile, marble, granite or other steam rated surface.
• MrSteam is not responsible for the steam room construction.
• Consult with qualified designer, architect or contractor for steam room construction.
For Installation assistance please call Customer or Technical support:
East Coast 1-800-767-8326 West Coast 1-800-727-8326
To view an installation video please go to: www.mrsteam.com
This video is for added visual assistance only. Do not install the Linear Steam Head using the video.
Use only these installation instructions for a safe and problem free installation.
Figure 4
STEP
5. Plumb rigid copper tubing or brass pipe from the
steam generator to the steam head. Plumbing must not form
traps or valleys. Thread sealant must be used as required to
ensure a leak free joint.
• Plumbing must be installed by a qualified and licensed
plumber. Plumbing in a manner that results in traps or
valleys in the pipe may result in a noisy or inoperable
installation.
• Plumbing without proper thread sealant may result in a
leak within the wall cavity and cause problems associated
with leaks, moisture and property damage from leaks.
• DO NOT use black iron pipe or galvanized pipe for the
steam line. Use brass pipe or copper tubing only, and in
accordance with national and local plumbing codes.
STEP
6. Run the steam generator for a few steam cycles to
observe and verify that the steam head, steam head
installation and plumbing are correct and free of leaks.
STEP
7. Insulate steam line and steam head using insulation rated 212°F
or higher. Insulate the steam head and piping as required to reduce
temperatures within the wall cavity. DO NOT locate the steam head or
plumbing near any materials, including wiring, devices, or products that may
be adversely affected by elevated temperatures. Failure to follow these
instructions may result in the failure of materials, including wiring, devices,
or products.
STEP
8. After the finished wall surface has been installed use high
temperature caulking around the steam outlet as required to make a
waterproof seal. (see Fig. 4)
STEP
9. A plastic protective film has been provided to protect the steam
head during installation. Remove the plastic protective film covering the
steam outlet to complete the installation.
CAUTIONS
!
Cement Board
Thin Set
Finished
Wall Surface
Steam Outlet Face
Silicone
Silicone
STUD
Flush to
1
/
8