Owners Manual
WARNING The information in this guide is designed to provide a general overview of how MrSteam® products are installed. All images and diagrams are for illustrative purposes only
and may have been altered for presentation purposes. NEVER use this document for the Installation, Operation or Maintenance of any MrSteam® product. For installation, operation and
maintenance information and instructions, only use the applicable MrSteam® Installation, Operation & Maintenance Manual(s). The specific Installation, Operation & Maintenance manual
that is supplied with each MrSteam® product contains important information required for the safe and reliable installation and operation of the product. Failure to install any MrSteam®
product according to the applicable manual may result in property damage, an inoperable system/control, or hazardous condition. If you do not have the applicable Installation, Operation
& Maintenance manual please contact MrSteam® for a free copy, or download a copy from www.mrsteam.com. If you have any questions about the installation, operation or maintenance of
any MrSteam® product please contact a customer or technical service representative using the contact information on the back cover of this guide or consult a properly licensed contractor,
architect and/or design professional.
STEP 1
Determine the location of the nisihed wall surface.
Mount the steam head between two studs using
the four slotted holes. Use a level to ensure steam
head is level in both the horizontal and vertical
positions. Position the steam head face to be ush
or extend 1/8” from the nished wall surface.
3/4” NPT Steam line opening should be on top.
DO NOT mount steam head upside down.
STEP 2
Attach steam piping to the 3/4” NPT opening on
the top of the linear steam head.
STEP 3
After the nished wall surface has been installed
use high temperature caulking around the steam
outlet as required to make a water proof seal.
For Illustrative purposes only. Consult with qualified designer, architect or
contractor for steamroom construction details.
34MRSTEAM
®
GUIDE