Installation Guide
mr
.
steam
®
Steam@Home
®
Installation, Operation & Maintenance Manual
________________________________________________________________________
installer
3
9. Limit steam room ceiling height to 8 feet.
10. A peel-off warning label has been provided in the
Information envelope (see Warning facsimile below).
This label is to be applied to the wall of the installed
shower or steam enclosure.
The SAH series of steam generators are
for residential use only. Commercial or other nonresidential
applications void the warranty and may adversely affect
product performance.
BEFORE INSTALLING
Carefully inspect the Steam Generator and packaging
for shipping damage. Please contact the carrier in the
event of shipping damage, please contact the carrier
for claim information. Our customer service depart-
ment can assist you with any missing or damaged
parts.
Never use damaged equipment,
doing so may result in an inoperative or hazardous
installation.
IMPORTANT NOTES:
This document contains important safety, operation
and maintenance information. Leave this document
with the homeowner. Do not discard this document.
IMPORTANT NOTE:
The following general information should be used
in conjunction with consultations with an architect,
designer and contractor in determining factors neces-
sary in providing a suitable and safe steam room.
STEAM ROOM GUIDELINES
IMPORTANT NOTES:
1. Steam room must be completely enclosed, with full walls,
door, floor and ceiling.
2. It is recommended that a gasketed door is used for heat
sealing and steam containment.
3. If smooth surfaced flooring is used, provide suitable
anti-skid strips or equivalent to prevent user slipping
and injury.
4. Walls and ceilings must be constructed of water-resistant,
non-corrosive surface, such as tile, molded acrylic, or
fiberglass. The ceiling should be sloped to prevent drip-
ping of condensate.
If acrylic or fiberglass are used as part of
the steam room enclosure. Consult with the material manu-
facture and see pg. 7 for additional details.
5. Provide a floor drain.
6. No heating, venting or air conditioning devices should
be installed inside the steam room.
7. Steam room tile construction information is available
from the Tile Council of America, Inc. by purchasing the
TCA Handbook for Ceramic Tile Installation.
Tel: (864) 646-8453 or www.tileusa.com.
8. Windows that are part of the steam room should be
double paned and tempered safety glass.
Read these instructions before installation or service.
Although this SAH steambath generator has been fully qualified for
shipment by MrSteam, the following must be reviewed for proper,
safe and enjoyable steam bathing:
• Verify that the model and accessories are correct, including
incoming line voltage.
• Insure steambath generator has been correctly sized for the
steambath room. Pay particular attention to room volume and
construction. If any questions, please refer to Mr. Steam sizing
and selection guide on page 2.
• The physical size of the unit, clearance for plumbing servicing,
and its distance from the steam room must all be considered
before installation.
IMPORTANT NOTE:
MrSteam SAH units are intended to be
operated with a MrSteam SteamStart® control only, and are to be
installed strictly in accordance with the specific instructions con-
tained in this manual.
ELECTRICAL SHOCK HAZARD. MrSteam steam
generators are intended to be connected to 208V or 240V line
voltage and contain live electrical components. All installation and
service to be performed by qualified and licensed electricians and
plumbers only. Installation or service by unqualified persons or fail-
ure to use Mr. Steam parts may void the warranty.
Not Actual Size
!
warnInG
!
warnInG
!
warnInG
!
cautIon