Operating Guide
14
mr
.
steam
®
towelwarmers Hydronic Models
_________________________________________________________________
Installation and Operating Instructions
WALL PREPARATION
• DO NOT mount the Towel Warmer without providing
structurally secure headers as shown.
• DO NOT mount the Towel Warmer directly to sheet rock
or any other non-structural surface.
• Use longer fasteners as required if the finished wall surface
prevents adequate mounting with the screws provided.
• The recommended location for the optional lower brackets is
on the bottom most rung of the Towel Warmer as shown.
*Inlet/outlet pipe to be 18
1
⁄2" apart for all models
IMPORTANT NOTE:
Towel Warmers may have small dimensional
variations and must be measured prior to installation.
For Technical Service Assistance:
East Coast Tel: 1-800-767-8326
West Coast Tel: 1-800-727-8326
PLUMBING PREPARATION
• If the eccentric coupling is used, a female 1/2 NPT coupling or thread-to-
sweat adapter should be flush with the finished face of the wall.
• If the eccentric coupling is not used a male 3/4 NPT pipe, coupling or thread
to sweat adapter shall be 1/2 an inch beyond the finished face of the wall.
CAUTION
!
MOUNTING DIMENSIONS (inches)*
MODEL Y1 Y2
H 542 26
7
⁄
16
22
7
⁄
16
H 552 22
13
⁄
16
18
13
⁄
16
H 562 21
1
⁄
16
17
1
⁄
16
H 572 26
7
⁄
16
22
7
⁄
16
Y1
Y2
(optional)
Minimum Header
Size 2" x 6"
18.5"
Inlet/Outlet Pipe
Center to Center
22" Min
Header Len
g
th
1/2 inch
3/4 NPT
(Eccentric
Coupling
not used)
Flush
1/2 NPT Coupling
or thread-to-sweat
adapter to be flush
with finished face
of wall.
Finished surface of wall
Brass Insert
Screw
Sliding Escutcheon
Header
Set Screw
Towel Warmer