Specifications

Known issues with
firmware v4.7 fdr 35
45
6.10. EM316FRM,EM316ERM,EM316EFRM
issues
6.10.1. IPLESS port shutdown status issue
(BZ#: 4578)
Description: When a pair of above listed modules are used as CO-CPE pair with a valid physical
connection between the CO-CPE trunk ports, status update for shutdown on IPLESS port (port 3) works
properly and almost instantaneously.
Confusion arises when the connection between the CO-CPE is missing. After issuing shutdown on the
IPLESS port3, you can confirm the status almost instantaneously using show. However, no shutdown
can not be confirmed until there is a valid connection between CO and CPE. Once there is a good
connection between CO and CPE, then show will display the actual status.
When this same feature is used from MegaVision, it appears as if the port 'enable' command is ignored.
This is because MegaVision at the moment does not have the facility to display 'desired/admin value', it
only displays 'actual/oper value'.
Suggested Work-Around: Use show config to confirm the command used, which will display
the desired value configured.
Customer Impact: Minimal. Informational only.
Corrective Action: No change to design. This feature works as designed.
6.11. EM316EUSM (Stage2) issues
6.11.1. 'pulse' commands not affected by default all
(BZ#: 5920)
Description: Issue a traffic-gen action start command to start traffic generation. Next,
issue a default all command. Observe that traffic generation is still ON and has not reverted to its
default state, OFF.
This is the case for all 'pulse' commands whose configuration is not saved and thus do not appear in the
show config or show defaults lists. loopback, pm, lga, select-link, cable-test,
reset cold,reset warm, clear-counters are a few examples of 'pulse' commands.
Suggested Work-Around: If necessary, use restart cold after using default all.
Customer Impact: Minor inconvenience.
Corrective Action: This issue will be addressed in a future software upgrade.