Infrastructure
The only infrastructure required for operating the transceiver and linking
the sites is Power and Data/Signal connection to the peripheral
networking equipment. This must be ready prior to the airlink installation
.
IN OUTDOOR INSTALLATIONS, USE SHIELDED AND
WEATHERPROOF MATERIALS (CABLES, INLETS,
CONNECTORS) COMPLIANT TO THE SAFETY STANDARD IN
FORCE.
Power
Source
The power requirement for standard units is 100-240VAC @
50/60Hz - 10W.
Note: Units requiring low Voltage : 24-60 VDC - 10W can be
factory set upon request.
It is recommended to use a Surge Suppression System to avoid
damage to the equipment when power supply is unstable.
Protection should be at least 25,000A.
Cabling
Standard 3-conductor power cords are required. (See Safety
requirements, Page iv)
Data/Signal Cabling
1. For TS700/155 , TS800/155 & TS800/155-F
Type
For connecting the Transceiver to the peripheral equipment, a dual-
fiber cable is required (one fiber for transmission, the other for
reception). The standard recommended cable is MM 62.5/125 µm
fiber or SM 9/125 µm for fiber.
Connectors
Each fiber should be terminated with the ordered type of connector
on the transceiver end (SC, ST).
Optical Fiber Testing
The cabling installer must specify the attenuation of each fiber
installed.