Operating instructions
Issue Date: 2003-09-25 Page 26 of 42 Report Reference #
E203413-A17-CB-1
IEC 60950
Clause Requirement + Test Result - Remark Verdict
TRF No.: 1950__F UL International Demko A/S TRF originator: FIMKO
5.3 Abnormal Operating and Fault Conditions Pass
5.3.1 Protection against overload and abnormal
operation
(see appended table 5.3) Pass
5.3.2 Motors No motors. N/A
5.3.3 Transformers Transformers are constructed
in accordance with the
applicable Clause and Annex
C.
(see appended Annex C)
Pass
5.3.4 Functional insulation...........................................:
Functional insulation complies
with method (c). See 5.3.8.
Pass
5.3.5 Electromechanical components
N/A
5.3.6 Simulation of faults See appended table 5.3. Pass
5.3.7 Unattended equipment
N/A
5.3.8 Compliance criteria for abnormal operating and
fault conditions
No fire, emission of molten
metal or deformation was
noted during the tests. Electric
Strength tests performed after
abnormal and fault tests.
Pass
6 CONNECTION TO TELECOMMUNICATION NETWORKS N/A
6.1 Protection of telecommunication network service personnel, and users of
other equipment connected to the network, from hazards in the equipment
N/A
6.1.1 Protection from hazardous voltages N/A
6.1.2 Separation of the telecommunication network from earth N/A
6.1.2.1 Requirements
N/A
Test voltage (V)..................................................:
-
Current in the test circuit(mA)..............................:
-
6.1.2.2 Exclusions .........................................................:
N/A










