Hardscaping Installation Manual www.msistone.
INDEX Installation of Pavers........................................................................... 1 Installation of Meshed Flagstone....................................................... 2 Installation of Veneer Stone................................................................ 3 www.msistone.
Sand Set Installation of Pavers 1. Preparing the ground Mark your project area with wooden stakes and string lines where you would like the top of your pavers. Remove sod and dig out area at least 7 3/8" below string line (if installing a residential driveway or parking area, you need to dig out at least 9 3/8"). 2. Making the Bed Bring in crushed rock for your sub base.
Installation of Mesh Mounted Flagstone 1. Surface Requirement • Meshed Flagstone is best installed over a sub-base. Mesh Flagstone is not design for Sand set installation. Entire installation surface must be clean and flat, and free of sealants, grease and other oily compounds. • Before you set the stone, find the center point of the room. Measure the length and width of the room, marking the halfway points. • Dry lay the mesh in order to determine where the cuts will need to be made at the edges.
Natural Stone Ledger Panels M S International’s Natural Stone Ledger panels are trimmed pieces of natural ledger stone affixed together to form modular panels, which allows for the streamlined installation of dry stacked ledge stone veneer. M S International’s natural stone veneer panels feature a unique joint design that becomes virtually undetectable after installation. We offer these panels in two styles: Natural stone ledger stepped panels and “L“ ledger stepped panel corners for outside corner.
Installation Of Veneer Stone 1. Preparing the surface (skip to step 3 if applying stone directly to block or cement surface) When Preparing the surface, apply a weather resistant barrier such as 2 ply 60 minute black paper as a water resistive barrier to a non-masonry surface. Overlap the paper 2" on horizontal seems and 6" on vertical seems. Apply wire lath horizontally over the Use 1" nails or staples to secure the lath. Nail or staple the lath vertically every 6" to further secure the lath.