Use and Care Manual

www.msistone.com
Sand Set Installation of Pavers
1. Preparing the ground
Mark your project area with wooden stakes and string lines where you
would like the top of your pavers. Remove sod and dig out area at least


2. Making the Bed




rock using a manual compactor. This procedure provides a level
surface upon which the pavers are laid, and is very important to the

3. Preparing Sand Bed





4. Lay Pavers

staggered pattern. If cut pavers are necessary, you can use a masonry
saw, or a hammer and chisel. Measure over to your string line every
few feet to make sure that you are staying on track.
5. Compacting
Sweep sand diagonally across pavement into the joints. Use a hand

inward, going over the surface at least twice, until the surface is level
to your satisfaction.
6. Sand Joints
Spread more sand over the surface of the pavement and sweep it


that wind or rain may empty.