User`s manual

2-10
SUPERSERVER 6026TT-HT(R)F/HIBX(R)F/HIBQ(R)F USER'S MANUAL
2-7 Preparing to Power On
Next, you should check to make sure the SATA drives and SATA backplane have
been properly installed and all connections have been made.
Checking the SATA drives
1. The SATA disk drives are accessable from the front of the server and can be
installed and removed from the front of the chassis without removing the top
chassis cover.
2. Depending upon your system's con guration, your system may have one or
more drives already installed. If you need to install SATA drives, please refer
to Chapter 6.
Checking the Air ow
1. Air ow is provided by four 8-cm PWM fans and (for each serverboard) one
air shroud. The system component layout was carefully designed to direct
suf cient cooling air ow to the components that generate the most heat.
2. Note that all power and data cables have been routed in such a way that they
do not block the air ow generated by the fans.
Providing Power
1. Plug the power cords from the power supplies unit into a high-quality power
strip that offers protection from electrical noise and power surges.
2. It is recommended that you use an uninterruptible power supply (UPS).
3. Finally, depress the power on button on the front of the chassis.