117: Install the Mounng Rail into the beam clamps
slot as per Mounng Rail instrucons. Use 3/8” x 1”
stainless steel bolts and 3/8” serrated ange nuts.
118: Center rails over I-beams, keeping equal length of
rail o the end of each beam. Tighten to 17  lbs.
Install Solar Modules as per Mounng Rail and module
manufacturer instrucons. See last page of manual for
Iron Ridge Rail and Clamp instrucons.
204” Rail Connecon
117
119
120
119: Leave out the appropriate module(s) to allow for the 8” pipe. It is ok to install the top and boom
modules of the center row(s) with just 2 clamps unl the array is lied to the top. Raise and or lt the
array to facilitate module installaon and/or module wiring and wire management as needed.
120: When wiring is completed, raise the array to the top of the pole.