Manual

3
Thank you for choosing MT Solar Pole Mounts.
It is the installers responsibility to determine the foundaon parameters based on local site condions,
such as wind speed, snow load, soil type, exposure category, etc. Installaons also must comply with local
building regulaons and perming requirements.
We recommend consulng a licensed engineer to determine appropriate foundaon dimensions and pipe
size and thickness. MT Solar can also provide a stamped drawing engineered for site-specic requirements
for an addional fee. Please contact us to nd out more.
Tips for Convenonal Pipe Installaon:
Dig hole according to recommended depth and diameter.
Set pipe in hole and use a level to ensure it is plumb and vercal to the ground.
If installing mulple poles, use a string to line up pipes.
Brace pipe to prevent it from moving while pouring concrete.
Proper compacon of backll around sonotube or form is recommended, unless pouring so that con-
crete is in direct contact with the soil.
Allow concrete to cure for recommended length of me.