Engineering Guide Specifications
3 Arrange piping to allow for dismantling to permit head
removal and tube cleaning.
4 Coordinate electrical installation with electrical
contractor.
5 Coordinate controls with control contractor.
6 Provide all material required for a fully operational and
functional chiller.
3.2 START-UP
A Factory Start-Up Services: Provide for as long a time as is
necessary to ensure proper operation of the unit, but in no
case for less than two full working days. During the period
of start-up, the start-up technician shall instruct the owner's
representative in proper care and operation of the unit.